|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/31/2024 Measured TD: 8652 ft. Vertical TD: 8561 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/31/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/16/2012 | | Proposed Top PZ Location: | Sec:27 Twp: 1N 68W | Footage: 44 FNL 66 FEL | | Bottom Hole Location: | Sec:27 Twp: 1N 68W | Footage: 36 FNL 62 FEL | | Proposed Depth/Form: | 8600 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 470, Top: 0 ft., Bottom: 1090 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8600 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 310, Top: 7430 ft., Bottom: 8600 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/24/2010 | | Spud Date: | 11/17/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8652 ft. | Measured PB depth: | 8580 ft. | | True Vertical TD: | 8561 ft. | True Vertical PB depth: | 8489 ft. | | Top PZ Location: | Sec:27 Twp: 1N 68W | Footage: 44 FNL 66 FEL | | Bottom Hole Location: | Sec:27 Twp: 1N 68W | Footage: 36 FNL 62 FEL | | Log Types: | CBL, IND/DEN/NEU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1138 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 422, Top: 0 ft., Bottom: 1138 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8635 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 714, Top: 4300 ft., Bottom: 8635 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4896 ft. | | | | | NIOBRARA | 7590 ft. | | | | | CODELL | 8022 ft. | | | | | J SAND | 8470 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/31/2024 Interval Top: 8470 ft. Interval Bottom: 8486 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/13/2010 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J SAND WITH 158,886 GAL 15# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,540# 20/40 SAND. 12-13-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8470 ft. | # Of Holes: | 32 | | Interval Bottom: | 8486 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 7/2/2024 Interval Top: 8022 ft. Interval Bottom: 8040 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8022 ft. | # Of Holes: | 36 | | Interval Bottom: | 8040 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: Status: CM - 1/25/2011 Interval Top: 7590 ft. Interval Bottom: 8486 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/25/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP @ 7360', 01-10-11. DRILLED OUT CBP @ 7360', CFP @ 7880', AND 8130' TO COMMINGLE THE JSND-CDL-NBRR. 01-12-11 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8446 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/25/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 53 | | BBLS_OIL | 60 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 53 | | CALC_BBLS_OIL | 60 | | CALC_GOR | 4033 | | CALC_MCF_GAS | 242 | | CASING_PRESS | 1286 | | GRAVITY_OIL | 51 | | MCF_GAS | 242 | | TUBING_PRESS | 545 |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 228 | | Interval Bottom: | 8486 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/31/2024 Interval Top: 7590 ft. Interval Bottom: 8040 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/13/2010 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 8130', 12-13-10. FRAC'D THE CODELL WITH 109,158 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,520# 20/40 SAND. 12-13-10
SET CFP @ 7880', 12-13-10 FRAC'D THE NIOBRARA WITH 131,334 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,420# 20/40 SAND 12-13-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 116 | | Interval Bottom: | 8040 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 7/2/2024 Interval Top: 7590 ft. Interval Bottom: 7782 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 80 | | Interval Bottom: | 7782 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/31/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|