|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/1/2025 Measured TD: 8750 ft. Vertical TD: 8582 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/24/2013 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 521 FSL 527 FWL | | Bottom Hole Location: | Sec:26 Twp: 1N 68W | Footage: 525 FSL 540 FWL | | Proposed Depth/Form: | 8752 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1040 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1040 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8752 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 7375 ft., Bottom: 8752 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5795 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4766 ft., Bottom: 5795 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/3/2011 | | Spud Date: | 9/28/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8750 ft. | Measured PB depth: | 8716 ft. | | True Vertical TD: | 8582 ft. | True Vertical PB depth: | 8548 ft. | | Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 521 FSL 527 FWL | | Bottom Hole Location: | Sec:26 Twp: 1N 68W | Footage: 525 FSL 540 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 1086 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 415, Top: 0 ft., Bottom: 1086 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8736 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 665, Top: 3490 ft., Bottom: 8736 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 5031 ft. | | | | | NIOBRARA | 7784 ft. | | | | | CODELL | 8223 ft. | | | | | J SAND | 8659 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 11/1/2025 Interval Top: 8673 ft. Interval Bottom: 8688 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/15/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/22/2011 | | Treatment Summary: | Frac'd the J-Sand 8673’– 8688’, (30 holes) w/ 62,706 gal 18 # Vistar Hybrid cross linked gel
containing 249,980# 20/40 Sand.11-22-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8673 ft. | # Of Holes: | 30 | | Interval Bottom: | 8688 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/27/2012 Interval Top: 8223 ft. Interval Bottom: 8243 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/15/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/22/2011 | | Treatment Summary: | Set CFP @ 8290'. 11-22-11
Frac'd the Codell 8223’ – 8243’, (38 holes) w/ 89,418 gal 22 # Vistar Hybrid
cross linked gel containing 250,200 # 30/50 sand. 11-22-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8223 ft. | # Of Holes: | 38 | | Interval Bottom: | 8243 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/18/2012 Interval Top: 7790 ft. Interval Bottom: 8688 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/15/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/18/2012 | | Treatment Summary: | Set CBP @ 7730'. 02-12-12.
Drilled out CBP @ 7730', CFP @ 8050', 8290' to commingle the JSND-NBRR-CDL. 02-14-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8637 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/18/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 168 | | BBLS_OIL | 175 | | BTU_GAS | 1134 | | CALC_BBLS_H2O | 168 | | CALC_BBLS_OIL | 175 | | CALC_GOR | 3143 | | CALC_MCF_GAS | 550 | | CASING_PRESS | 1882 | | GRAVITY_OIL | 48 | | MCF_GAS | 550 | | TUBING_PRESS | 1096 |
| | Perforation Data: | | Interval Top: | 7790 ft. | # Of Holes: | 228 | | Interval Bottom: | 8688 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 11/1/2025 Interval Top: 7790 ft. Interval Bottom: 8243 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/15/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7790 ft. | # Of Holes: | 198 | | Interval Bottom: | 8243 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/27/2012 Interval Top: 7790 ft. Interval Bottom: 7996 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/22/2011 | | Treatment Summary: | Set CFP @ 8050'. 11-22-11
Frac'd the Niobrara 7790’ – 7996’ (160 holes), w/ 97,524 gals 18 # Vistar
Hybrid cross linked gel containing 250,760# 30/50 sand. 11-22-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7790 ft. | # Of Holes: | 160 | | Interval Bottom: | 7996 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 360 |
| Total Gas Produced (MCF) | 837 |
| GOR | 2325 |
| GOR Determination | BOE |
| Average BOE per Day | 1.783 |
| Average MCFE per Day | 10.346 |
| Federal Financial Assurance | i | |
|
|