|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/6/2021 Measured TD: 8815 ft. Vertical TD: 8605 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/6/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | 20075609 | Expiration Date: | 2/5/2009 | Proposed Top PZ Location: | Sec: Twp: | Footage: 510 FNL 510 FEL | Bottom Hole Location: | Sec:34 Twp: 1N 68W | Footage: 510 FNL 510 FEL | Proposed Depth/Form: | 8869 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | 7/12/2008 | Spud Date: | 7/6/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8815 ft. | Measured PB depth: | 8766 ft. | True Vertical TD: | 8605 ft. | True Vertical PB depth: | 8556 ft. | Top PZ Location: | Sec:34 Twp: 1N 68W | Footage: 515 FNL 495 FEL | Bottom Hole Location: | Sec:34 Twp: 1N 68W | Footage: 515 N 495 E | Log Types: | CBL, DUAL IND/COMP DENSITY/COMP NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1083 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1083 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8795 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 7090 ft., Bottom: 8795 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5595 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 4440 ft., Bottom: 5622 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5598 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 4440 ft., Bottom: 5622 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5010 ft. | | N | N | SHANNON | 5598 ft. | | N | N | NIOBRARA | 7755 ft. | | N | N | CODELL | 8200 ft. | | N | N | J SAND | 8630 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/6/2021 Interval Top: 8644 ft. Interval Bottom: 8662 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/7/2008 | Treatment Summary: | JSND COMPLETION. FRAC'D JSND W/ 155,232 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,120# SAND. 9/7/08 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8644 ft. | # Of Holes: | 36 | Interval Bottom: | 8662 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/11/2021 Interval Top: 8200 ft. Interval Bottom: 8218 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 7/20/2012 | Treatment End Date: | 7/20/2012 | Treatment Summary: | 2874 bbls of water, 9 bbls of additives (GW-45LF, GBW-21, GBW-5, HighPerm CRB, BC-3, BF-9L, ClayCare, XLW-14, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a 1 stage frac with 165560 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 2883 | Max pressure during treatment (psi): | 3543 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.77 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 2883 | Disposition method For flowback: | | Total proppant used (lbs): | 165560 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8200 ft. | # Of Holes: | 72 | Interval Bottom: | 8218 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/12/2008 Interval Top: 7946 ft. Interval Bottom: 8662 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/12/2008 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP'S TO COMMINGLE THE JSND-NBRR-CDL. 10-15-08 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8629 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/27/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 120 | BBLS_OIL | 75 | BTU_GAS | 1177 | CALC_BBLS_H2O | 120 | CALC_BBLS_OIL | 75 | CALC_GOR | 8067 | CALC_MCF_GAS | 605 | CASING_PRESS | 111 | GRAVITY_OIL | 48 | MCF_GAS | 605 | TUBING_PRESS | 612 |
| Perforation Data: | Interval Top: | 7946 ft. | # Of Holes: | 144 | Interval Bottom: | 8662 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/6/2021 Interval Top: 7946 ft. Interval Bottom: 8218 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/12/2008 | Treatment Summary: | NB-CD RECOMPLTN. SET CFP @8310'. FRACD CODL W/109,662 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,020# SAND. SET CFP@8080'. FRACD NBRR W/141,792 GAL 18# GEL HYBRIDCONTAINING 251,360# SAND. 9/7/08 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/12/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 145 | BBLS_OIL | 85 | BTU_GAS | 1177 | CALC_BBLS_H2O | 145 | CALC_BBLS_OIL | 85 | CALC_GOR | 2341 | CALC_MCF_GAS | 199 | CASING_PRESS | 654 | GRAVITY_OIL | 48 | MCF_GAS | 199 |
| Perforation Data: | Interval Top: | 7946 ft. | # Of Holes: | 108 | Interval Bottom: | 8218 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/11/2021 Interval Top: 7946 ft. Interval Bottom: 7964 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 8/11/2021 | Treatment End Date: | N/A | Treatment Summary: | 5182 bbls of water, 17 bbls of additives (GW-45LF, GBW-21, GBW-5, HighPerm CRB, BC-3, BF-9L, ClayCare, XLW-14, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a 1 stage frac with 166220 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 5199 | Max pressure during treatment (psi): | 5073 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.78 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 5199 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 166220 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7946 ft. | # Of Holes: | 20 | Interval Bottom: | 7964 ft. | Hole Size: | 0.77 in. |
|
|
|
|
|
Reported Plugged | Y | 01/06/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|