Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20645
Well Classification: GW Status: PA - 2/4/2021
Well Name/No:BICKLER #4-6-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/4/2021
FacilityID:293770LocationID:335860
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NESW 34 1N68W 6
Field:WATTENBERG - #90750Elevation:5170 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2411FSL  2427 FWLLat/Long: 40.006930 / -104.990430Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.006918 / -104.990383Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/23/2012
End Date: 8/23/2012
Reported: 10/12/2012
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/4/2021             Measured TD: 8710 ft.    Vertical TD: 8608 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/4/2021
Wellbore PermitDIRECTIONAL
Permit #:20075533 Expiration Date:11/27/2008
Proposed Top PZ Location:Sec:34 Twp: 1N 68W Footage: 1320 FSL  2555 FWL
Bottom Hole Location:Sec:34 Twp: 1N 68W Footage: 1320 FSL  2555 FWL
Proposed Depth/Form:8274 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: E2SW
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: E2SW
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: E2SW
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5799 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 260, Top: 4699 ft., Bottom: 5799 ft.

Wellbore Completed
Completion Date:9/5/2008
Spud Date:8/29/2008Spud Date Is:ACTUAL
Measured TD:8710 ft.Measured PB depth:8647 ft.
True Vertical TD:8608 ft.True Vertical PB depth:8545 ft.
Top PZ Location:Sec:34 Twp: 1N 68WFootage: 1320 FSL  2555 FWL
Bottom Hole Location:Sec:34 Twp: 1N 68WFootage: 1320 FSL  2555 FWL
Log Types:CBL, DUAL IND/COMP DENSITY/ COMP NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1110 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 1110 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8680 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 7010 ft., Bottom: 8680 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5571 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 4280 ft., Bottom: 5571 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: 4.5 in., Top: , Depth: 5571 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 4280 ft., Bottom: 5571 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4886 ft.NN
SHANNON5544 ft.NN
NIOBRARA7667 ft.NN
CODELL8118 ft.NN
J SAND8546 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 2/4/2021                  Interval Top: 8562 ft.    Interval Bottom: 8576 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/9/2008
Treatment Summary:JSND COMPLETION. FRAC'D JSND W/157,038 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,200# SAND. 10/9/08
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8562 ft.# Of Holes:28
Interval Bottom:8576 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/11/2021                 Interval Top: 8118 ft.    Interval Bottom: 8134 ft.

 Completed Information for Formation CODELL
1st Production Date:9/17/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/16/2012Treatment End Date:8/16/2012
Treatment Summary:4596 bbls of water, 16 bbls of additives (GW-45LF, GBW-21, HighPerm CRB, BC-3, BF-9L, ClayCare, XLW-14, XLW-22C, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a 1 stage frac with 125020 lbs of silica quartz proppant
Total fluid used in treatment (bbls):4612Max pressure during treatment (psi):4720
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):4612Disposition method For flowback:DISPOSAL
Total proppant used (lbs):125020Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8118 ft.# Of Holes:64
Interval Bottom:8134 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 11/7/2008                 Interval Top: 7862 ft.    Interval Bottom: 8576 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2008
Treatment Summary:JSND-NBRR-CDL COMMINGLE; DRILLED OUT CFP @ 7990 AND 8240 TO COMMINGLE THE JSND-NBRR-CDL 10/18/08
Tubing Size:2.375 in.Tubing Setting Depth:8527 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/7/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 59
BBLS_OIL 43
BTU_GAS 1000
CALC_BBLS_H2O 59
CALC_BBLS_OIL 43
CALC_GOR 8767
CALC_MCF_GAS 377
CASING_PRESS 1144
GRAVITY_OIL 48
MCF_GAS 377
TUBING_PRESS 587
Perforation Data:
Interval Top:7862 ft.# Of Holes:124
Interval Bottom:8576 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/4/2021                  Interval Top: 7862 ft.    Interval Bottom: 8134 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/9/2008
Treatment Summary:NBRR-CODL RECOMPLETION. SET CFP @ 8240. FRAC'D CODL W/117,762 GAL 25# VISTAR HYBRID CROSS LINKED GEL CONTAINING 256,080# SAND. 10/9/08. SET CFP @7990'. FRACD NBRR W/163,692 GAL 18# VISTAR HYBRID CROSS LIMKED GEL CONTAINING 250,700# SAND.10/9/08.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/21/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 188
BBLS_OIL 99
BTU_GAS 1000
CALC_BBLS_H2O 188
CALC_BBLS_OIL 99
CALC_GOR 2394
CALC_MCF_GAS 237
CASING_PRESS 610
GRAVITY_OIL 47
MCF_GAS 237
Perforation Data:
Interval Top:7862 ft.# Of Holes:96
Interval Bottom:8134 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/11/2021                 Interval Top: 7862 ft.    Interval Bottom: 7878 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/17/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/23/2012Treatment End Date:8/23/2012
Treatment Summary:3293 bbls of water, 12 bbls of additives (GW-45LF, GBW-21, HighPerm CRB, BC-3, BF-9L, ClayCare, XLW-14, XLW-22C, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a stage frac with 250312 lbs of silica quartz proppant
Total fluid used in treatment (bbls):3305Max pressure during treatment (psi):4777
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3305Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250312Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7862 ft.# Of Holes:32
Interval Bottom:7878 ft.Hole Size:0.71 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/04/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No