Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06634
Well Classification: OW Status: PA - 7/2/2019
Well Name/No:CANYON CREEK #4-8-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/2/2019
FacilityID:417051LocationID:415299
Municipality/County:ERIE / BOULDER #013Location:NWSE 13 1N69W 6
Field:WATTENBERG - #90750Elevation:5058 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2031FSL  2107 FELLat/Long: 40.049530 / -105.063010Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.049532 / -105.063021Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/5/2012
End Date: 8/5/2012
Reported: 9/13/2012
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/2/2019             Measured TD: 8802 ft.    Vertical TD: 8395 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/2/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/10/2013
Proposed Top PZ Location:Sec:13 Twp: 1N 69W Footage: 20 FSL  2601 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69W Footage: 37 FSL  2528 FEL
Proposed Depth/Form:8501 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 0 ft., Bottom: 790 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8501 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7326 ft., Bottom: 8501 ft.

Wellbore Completed
Completion Date:7/13/2012
Spud Date:7/9/2012Spud Date Is:ACTUAL
Measured TD:8802 ft.Measured PB depth:8760 ft.
True Vertical TD:8395 ft.True Vertical PB depth:8353 ft.
Top PZ Location:Sec:13 Twp: 1N 69WFootage: 20 FSL  2601 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69WFootage: 37 FSL  2528 FEL
Log Types:CBL
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 197 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 155, Top: 0 ft., Bottom: 197 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 850 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8788 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 3720 ft., Bottom: 8802 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4873 ft.
NIOBRARA7869 ft.
CODELL8267 ft.
J SAND8673 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 7/2/2019                  Interval Top: 8686 ft.    Interval Bottom: 8702 ft.

 Completed Information for Formation J SAND
1st Production Date:10/12/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/21/2012
Treatment Summary:Frac'd the J-Sand 8,686’ – 8,702’, (48 holes)w/ 65,564 gal 18 # pHaser Hybrid cross linked gel containing 252,350 # 20/40 Sand. 08-05-12
Total fluid used in treatment (bbls):3845Max pressure during treatment (psi):3384
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):3845Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):252699Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8686 ft.# Of Holes:48
Interval Bottom:8702 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/7/2013                  Interval Top: 8268 ft.    Interval Bottom: 8282 ft.

 Completed Information for Formation CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/21/2012
Treatment Summary:Set CFP @ 8475'. 08-05-12 Frac'd the Codell 8,268’ – 8,282’ (42 holes) w/ 89,512 gal 22# pHaser Hybrid cross linked gel containing 251,881 # 30/50 sand 08-05-12
Total fluid used in treatment (bbls):2756Max pressure during treatment (psi):4399
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):2756Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251881Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8268 ft.# Of Holes:42
Interval Bottom:8282 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/13/2012                Interval Top: 7874 ft.    Interval Bottom: 8702 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/13/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7830'. 08-19-12 Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 08-21-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8671 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 135
BBLS_OIL 85
BTU_GAS 1207
CALC_BBLS_H2O 135
CALC_BBLS_OIL 85
CALC_GOR 5729
CALC_MCF_GAS 487
CASING_PRESS 1577
GRAVITY_OIL 52
MCF_GAS 487
TUBING_PRESS 736
Perforation Data:
Interval Top:7874 ft.# Of Holes:130
Interval Bottom:8702 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/2/2019                  Interval Top: 7874 ft.    Interval Bottom: 8282 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7874 ft.# Of Holes:82
Interval Bottom:8282 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/7/2013                  Interval Top: 7874 ft.    Interval Bottom: 8046 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/21/2012
Treatment Summary:Set CFP @ 8120'. 08-05-12 Frac'd the Niobrara 7,874-7878’; 8,040-8,046’. (40 holes), w/ 99,479 gals 18 # pHaser Hybrid cross linked gel containing 254,939 # 30/50 sand. 08-05-12
Total fluid used in treatment (bbls):3291Max pressure during treatment (psi):4317
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):3291Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250520Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7874 ft.# Of Holes:40
Interval Bottom:8046 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/02/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No