Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06632
Well Classification: OW Status: PA - 11/17/2022
Well Name/No:CANYON CREEK #43-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/17/2022
FacilityID:415313LocationID:415299
Municipality/County:ERIE / BOULDER #013Location:NWSE 13 1N69W 6
Field:WATTENBERG - #90750Elevation:5058 ft.
Planned Location:2045FSL  2133 FELLat/Long: 40.049570 / -105.063100Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.049580 / -105.063108Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/6/2012
End Date: 8/6/2012
Reported: 9/13/2012
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/17/2022             Measured TD: 8650 ft.    Vertical TD: 8400 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/17/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/10/2013
Proposed Top PZ Location:Sec:13 Twp: 1N 69W Footage: 2070 FSL  544 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69W Footage: 2067 FSL  530 FEL
Proposed Depth/Form:8607 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 0 ft., Bottom: 790 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8607 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7442 ft., Bottom: 8607 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5496 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4460 ft., Bottom: 5496 ft.

Wellbore Completed
Completion Date:7/2/2012
Spud Date:6/27/2012Spud Date Is:ACTUAL
Measured TD:8650 ft.Measured PB depth:8565 ft.
True Vertical TD:8400 ft.True Vertical PB depth:8336 ft.
Top PZ Location:Sec:13 Twp: 1N 69WFootage: 2070 FSL  544 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69WFootage: 2067 S  530 E
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 182 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: 182 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 850 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8637 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 1800 ft., Bottom: 8650 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4723 ft.
NIOBRARA7644 ft.
CODELL8048 ft.
J SAND8484 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 11/17/2022                Interval Top: 8495 ft.    Interval Bottom: 8511 ft.

 Completed Information for Formation J SAND
1st Production Date:10/19/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/16/2012
Treatment Summary:Frac'd the J-Sand 8,495’ – 8,511’, (48 holes)w/ 63,121 gal 18 # pHaser Hybrid cross linked gel containing 242,600 # 20/40 Sand. 08-04-12
Total fluid used in treatment (bbls):2764Max pressure during treatment (psi):4776
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):2764Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):249899Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8495 ft.# Of Holes:48
Interval Bottom:8511 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/7/2013                  Interval Top: 8049 ft.    Interval Bottom: 8063 ft.

 Completed Information for Formation CODELL
1st Production Date:10/19/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/16/2012
Treatment Summary:Set CFP @ 8325'. 08-04-12 Frac'd the Codell 8,049’ – 8,063’ (42 holes) w/ 88343 gal 22# pHaser Hybrid cross linked gel containing 252,144 # 20/40 sand. 08-04-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8049 ft.# Of Holes:42
Interval Bottom:8063 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/9/2012                 Interval Top: 7648 ft.    Interval Bottom: 8511 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/19/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/9/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7570'. 08-15-12 Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 08-16-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8462 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/9/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 60
BBLS_OIL 52
BTU_GAS 1207
CALC_BBLS_H2O 60
CALC_BBLS_OIL 52
CALC_GOR 4615
CALC_MCF_GAS 240
CASING_PRESS 2116
GRAVITY_OIL 52
MCF_GAS 240
TUBING_PRESS 1292
Perforation Data:
Interval Top:7648 ft.# Of Holes:180
Interval Bottom:8511 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 11/17/2022                Interval Top: 7648 ft.    Interval Bottom: 8063 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/19/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7648 ft.# Of Holes:130
Interval Bottom:8063 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/7/2013                  Interval Top: 7648 ft.    Interval Bottom: 7817 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/19/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/21/2012Treatment End Date:8/16/2012
Treatment Summary:Set CFP @ 7870'. 08-04-12 Frac'd the Niobrara 7,648-7,654’; 7,806-7817’ (88 holes), w/ 101,244 gals 18 # pHaser Hybrid cross linked gel containing 248,050 # 30/50 sand. 08-06-12
Total fluid used in treatment (bbls):3409Max pressure during treatment (psi):5361
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):3409Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250600Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7648 ft.# Of Holes:88
Interval Bottom:7817 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/17/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No