Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06629
Well Classification: OW Status: PA - 7/1/2019
Well Name/No:CANYON CREEK #44-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/1/2019
FacilityID:415297LocationID:415299
Municipality/County:ERIE / BOULDER #013Location:NWSE 13 1N69W 6
Field:WATTENBERG - #90750Elevation:5058 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2050FSL  2141 FELLat/Long: 40.049590 / -105.063130Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.049592 / -105.063138Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/3/2012
End Date: 8/3/2012
Reported: 9/13/2012
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/1/2019             Measured TD: 8872 ft.    Vertical TD: 8381 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/1/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/10/2013
Proposed Top PZ Location:Sec:13 Twp: 1N 69W Footage: 538 FSL  556 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69W Footage: 559 FSL  522 FEL
Proposed Depth/Form:8779 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 0 ft., Bottom: 790 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8779 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 10, Top: 7604 ft., Bottom: 8779 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5633 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4581 ft., Bottom: 5633 ft.

Wellbore Completed
Completion Date:6/26/2012
Spud Date:6/22/2012Spud Date Is:ACTUAL
Measured TD:8872 ft.Measured PB depth:8816 ft.
True Vertical TD:8381 ft.True Vertical PB depth:8325 ft.
Top PZ Location:Sec:13 Twp: 1N 69WFootage: 538 FSL  556 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69WFootage: 559 FSL  522 FEL
Log Types:CBL
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 195 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 155, Top: 0 ft., Bottom: 195 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 840 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 850 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8858 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 4300 ft., Bottom: 8872 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4901 ft.
NIOBRARA7948 ft.
CODELL8352 ft.
J SAND8751 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 7/1/2019                  Interval Top: 8764 ft.    Interval Bottom: 8780 ft.

 Completed Information for Formation J SAND
1st Production Date:10/12/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/14/2012
Treatment Summary:Frac''d the J-Sand 8,764’ – 8,780’, (48 holes)w/ 66,210 gal 18 # pHaser Hybrid cross linked gel containing 251,900 # 20/40 Sand. 08-01-12
Total fluid used in treatment (bbls):3841Max pressure during treatment (psi):3884
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):3841Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):253029Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8764 ft.# Of Holes:48
Interval Bottom:8780 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/7/2013                  Interval Top: 8353 ft.    Interval Bottom: 8367 ft.

 Completed Information for Formation CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/14/2012
Treatment Summary:Set CFP @ 8546'. 08-01-12 Frac'd the Codell 8,353’ – 8,367’ (42 holes) w/ 38,442 gal 22# pHaser Hybrid cross linked gel containing 54,300 # 20/40 sand. 08-01-12
Total fluid used in treatment (bbls):1626Max pressure during treatment (psi):6060
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):1626Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):54307Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8353 ft.# Of Holes:42
Interval Bottom:8367 ft.Hole Size:

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/31/2012                Interval Top: 7955 ft.    Interval Bottom: 8780 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/31/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7910'. 08-13-12 Drilled out CBP and CFP's to coommingle the JSND-NBRR-CDL. 08-14-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8726 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 48
BBLS_OIL 43
BTU_GAS 1207
CALC_BBLS_H2O 48
CALC_BBLS_OIL 43
CALC_GOR 8465
CALC_MCF_GAS 364
CASING_PRESS 1147
GRAVITY_OIL 52
MCF_GAS 364
TUBING_PRESS 322
Perforation Data:
Interval Top:7955 ft.# Of Holes:130
Interval Bottom:8780 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/1/2019                  Interval Top: 7955 ft.    Interval Bottom: 8367 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7955 ft.# Of Holes:82
Interval Bottom:8367 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/7/2013                  Interval Top: 7955 ft.    Interval Bottom: 8122 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/14/2012
Treatment Summary:Set CFP @ 8190'. 08-02-12 Frac'd the Niobrara 7,955-7,959’; 8,116-8,122’ (40 holes), w/ 102,173 gals 18 # pHaser Hybrid cross linked gel containing 250,093 # 30/50 sand. 08-03-12
Total fluid used in treatment (bbls):3395Max pressure during treatment (psi):5013
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.77
Recycled water used in treatment (bbls):3395Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):252141Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7955 ft.# Of Holes:40
Interval Bottom:8122 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/01/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No