|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2026 Measured TD: 8471 ft. Vertical TD: 8352 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/3/2011 | | Proposed Top PZ Location: | Sec:12 Twp: 1N 69W | Footage: 50 FNL 2590 FWL | | Bottom Hole Location: | Sec:12 Twp: 1N 69W | Footage: 50 FNL 2590 FWL | | Proposed Depth/Form: | 8431 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8431 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 7193 ft., Bottom: 8431 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5207 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4200 ft., Bottom: 5207 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/22/2010 | | Spud Date: | 10/17/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8471 ft. | Measured PB depth: | 8428 ft. | | True Vertical TD: | 8352 ft. | True Vertical PB depth: | 8309 ft. | | Top PZ Location: | Sec:12 Twp: 1N 69W | Footage: 26 FNL 2547 FWL | | Bottom Hole Location: | Sec:12 Twp: 1N 69W | Footage: 5 FNL 2529 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 893 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 893 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8460 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 770, Top: 3250 ft., Bottom: 8460 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4464 ft. | | | | | NIOBRARA | 7450 ft. | | | | | CODELL | 7804 ft. | | | |
Formation JSND Formation Classification: Status: PR - 2/1/2026 Interval Top: 8236 ft. Interval Bottom: 8266 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/2/2010 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J-SAND WITH 154098 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250980 # 20/40 SAND. 11/02/10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8236 ft. | # Of Holes: | 48 | | Interval Bottom: | 8266 ft. | Hole Size: | 0.4 in. |
|
Formation JNBCD Formation Classification: Status: CM - 11/22/2010 Interval Top: 7564 ft. Interval Bottom: 8266 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/3/2010 | | Treatment Summary: | JSND-CDL-NIOBRARA COMMINGLE
SET CBP @ 7500'. 11-17-10. DRILLED OUT CBP @ 7500', CFP @ 7710' AND 7920' TO COMMINGLE THE JSND-CDL-NBRR. 11-18-10 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8218 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/22/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 42 | | BBLS_OIL | 43 | | BTU_GAS | 1326 | | CALC_BBLS_H2O | 42 | | CALC_BBLS_OIL | 43 | | CALC_GOR | 6465 | | CALC_MCF_GAS | 278 | | CASING_PRESS | 1724 | | GRAVITY_OIL | 52 | | MCF_GAS | 278 | | TUBING_PRESS | 531 |
| | Perforation Data: | | Interval Top: | 7564 ft. | # Of Holes: | 168 | | Interval Bottom: | 8266 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: Status: PR - 2/1/2026 Interval Top: 7564 ft. Interval Bottom: 7824 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/3/2010 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 7920'. 11-02-10.
FRAC'D THE CODELL WITH 116256 GAL 22 # VISTOAR HYBRID CROSS LINKED GEL 254691 # 30/50 SAND. 11-03-10
SET CFP @ 7710'. 11-03-10. FRAC'D THE NIOBRARA WITH 139566 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250160 # 30/50 SAND. 11/03/10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7564 ft. | # Of Holes: | 120 | | Interval Bottom: | 7824 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 320 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.133 |
| Average MCFE per Day | 0.792 |
| Federal Financial Assurance | i | |
|
|