Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06558
Well Classification: OW Status: SI - 6/1/2022
Well Name/No:YOUNG MC #23-14D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2022
FacilityID:291847LocationID:335559
Municipality/County:ERIE / BOULDER #013Location:SWSW 23 1N69W 6
Field:WATTENBERG - #90750Elevation:5130 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:611FSL  752 FWLLat/Long: 40.030910 / -105.090570Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.030913 / -105.090566Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 6/1/2022             Measured TD: 8700 ft.    Vertical TD: 8531 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 6/1/2022
Wellbore PermitDIRECTIONAL
Permit #:20091696 Expiration Date:5/27/2010
Proposed Top PZ Location:Sec:23 Twp: 1N 69W Footage: 718 FSL  1974 FWL
Bottom Hole Location:Sec:23 Twp: 1N 69W Footage: 720 FSL  1974 FWL
Proposed Depth/Form:8498 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8650 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: , Bottom: 8650 ft.

Wellbore Completed
Completion Date:9/8/2009
Spud Date:8/30/2009Spud Date Is:ACTUAL
Measured TD:8700 ft.Measured PB depth:8632 ft.
True Vertical TD:8531 ft.True Vertical PB depth:8463 ft.
Top PZ Location:Sec:23 Twp: 1N 69WFootage: 718 FSL  1974 FWL
Bottom Hole Location:Sec:23 Twp: 1N 69WFootage: 720 FSL  1974 FWL
Log Types:CBL/GR/CCL, CDL/CNL/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 773 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 277, Top: 0 ft., Bottom: 782 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8676 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 2200 ft., Bottom: 8676 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7636 ft.
FORT HAYS8050 ft.
CODELL8070 ft.
D SAND8432 ft.
MOWRY8482 ft.
J SAND8495 ft.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 1/20/2010                 Interval Top: 7672 ft.    Interval Bottom: 8522 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/12/2010Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/13/2009
Treatment Summary:COMMINGLE CODELL/NIOBRARA/J-SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2010Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 90
BTU_GAS 1252
CALC_BBLS_OIL 90
CALC_GOR 3466
CALC_MCF_GAS 312
CASING_PRESS 500
GRAVITY_OIL 52
MCF_GAS 312
Perforation Data:
Interval Top:7672 ft.# Of Holes:164
Interval Bottom:8522 ft.Hole Size:

Formation JSND                     Formation Classification:  OW                     Status:  SI - 4/1/2022                  Interval Top: 7672 ft.    Interval Bottom: 8522 ft.

 Completed Information for Formation J SAND
1st Production Date:1/12/2010Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/13/2009
Treatment Summary:FRAC'D J-SAND W/176568 GALS OF SILVERSTIM AND SLICKWATER WITH 335,000 #'S OF OTTAWA SAND.THE J-SAND IS PRODUCING THROUGH A COMPOSITE FLOW THROUGH PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7672 ft.# Of Holes:48
Interval Bottom:8522 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 6/1/2022                  Interval Top: 7672 ft.    Interval Bottom: 8089 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/12/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/13/2009
Treatment Summary:FRAC'D NIOBRARA W/175560 GALS OF SILVERSTIM AND SLICKWATER WITH 250,000 #'S OF OTTAWA SAND. NB PERFS 7672-7876, 48 HOLES, SIZE 0.73". CD PERFS 8071-8089, 68 HOLES, SIZE 0.41". FRAC'D CD W/133602 GALS SILVERSTIM & SW W/270,00#'S OTTAWA SAND. CD PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7672 ft.# Of Holes:116
Interval Bottom:8089 ft.Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
05/31/2022
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No