|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2021 Measured TD: 8350 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2021 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 7/10/2008 | | Proposed Depth/Form: | 8343 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5248 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4268 ft., Bottom: 5248 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/15/2008 | | Spud Date: | 4/9/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8350 ft. | Measured PB depth: | 8289 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 904 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 0 ft., Bottom: 904 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8331 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6938 ft., Bottom: 8331 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5373 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 4512 ft., Bottom: 5373 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4440 ft. | | N | N | | SHANNON | 5016 ft. | | N | N | | NIOBRARA | 7397 ft. | | N | N | | CODELL | 7767 ft. | | N | N | | J SAND | 8198 ft. | | N | N |
Formation JSND Formation Classification: OW Status: PR - 5/1/2021 Interval Top: 8209 ft. Interval Bottom: 8226 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/7/2008 | | Treatment Summary: | 168,882 GAL FRAC FLUID; 253,200# SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8209 ft. | # Of Holes: | 34 | | Interval Bottom: | 8226 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 6/2/2008 Interval Top: 7397 ft. Interval Bottom: 8226 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/15/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8193 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/2/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 55 | | BBLS_OIL | 28 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 55 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 6571 | | CALC_MCF_GAS | 184 | | CASING_PRESS | 1124 | | GRAVITY_OIL | 50 | | MCF_GAS | 184 | | TUBING_PRESS | 279 |
| | Perforation Data: | | Interval Top: | 7397 ft. | # Of Holes: | 164 | | Interval Bottom: | 8226 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 5/1/2021 Interval Top: 7397 ft. Interval Bottom: 7786 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/15/2008 | | Treatment Summary: | FRAC'D CODELL W/ 116,382 GAL FRAC FLUID; 253,020# SAND; FRAC'D NIOBRARA W/162,288 GAL FRAC FLUID; 253,140# SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7397 ft. | # Of Holes: | 130 | | Interval Bottom: | 7786 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 295 |
| Total Gas Produced (MCF) | 8607 |
| GOR | 29176 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.884 |
| Average MCFE per Day | 28.342 |
| Federal Financial Assurance | i | |
|
|