Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06547
Well Classification: GW Status: SI - 1/1/2025
Well Name/No:WHEELER #33-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:290801LocationID:321480
County:BOULDER #013Location:NWSE 1 1N69W 6
Field:WATTENBERG - #90750Elevation:4968 ft.
Planned Location:1969FSL  2010 FELLat/Long: 40.078470 / -105.062620Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.078470 / -105.062628Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/9/2010
End Date: 12/9/2010
Reported: 2/7/2012
Prior to rule 205A.b.(2)(A)
Days to report: 425
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2025             Measured TD: 8050 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2025
Wellbore Permit
Permit #: Expiration Date:11/29/2011
Proposed Depth/Form:8238 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 370, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8238 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 7123 ft., Bottom: 8238 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5123 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 4133 ft., Bottom: 5123 ft.

Wellbore Completed
Completion Date:11/14/2010
Spud Date:11/5/2010Spud Date Is:ACTUAL
Measured TD:8050 ft.Measured PB depth:8026 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1 FL  2 FL
Bottom Hole Location:Sec: Twp: Footage: 1 FL  2 FL
Log Types:CBL, GAMMA RAY, C.C.L. DIL, DEN/NEU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 893 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 331, Top: 0 ft., Bottom: 893 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8039 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 695, Top: 3820 ft., Bottom: 8039 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4418 ft.
NIOBRARA7336 ft.
CODELL7704 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 1/1/2025                  Interval Top: 8068 ft.    Interval Bottom: 8098 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/9/2010
Treatment Summary:J SAND COMPLETION. FRAC'D THE J-SAND WITH 155,988 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 29,913 # 20/40 SAND. 12/09/2010.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8068 ft.# Of Holes:0
Interval Bottom:8098 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/14/2011                 Interval Top: 7450 ft.    Interval Bottom: 8098 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/23/2010
Treatment Summary:JSND-NBRR-COMMINGLE. DRILLED OUT CBP @ 7630'. 03/08/2011. DRILLED OUT CFP @ 7660 AND 7900' TO COMMINGLE THE JSND-CDL-NBRR. 03/08/2011.
Tubing Size:2.375 in.Tubing Setting Depth:8015 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/14/2011Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 29
BBLS_OIL 30
BTU_GAS 1208
CALC_BBLS_H2O 29
CALC_BBLS_OIL 30
CALC_GOR 44067
CALC_MCF_GAS 322
CASING_PRESS 1020
GRAVITY_OIL 54
MCF_GAS 322
TUBING_PRESS 500
Perforation Data:
Interval Top:7450 ft.# Of Holes:364
Interval Bottom:8098 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 1/1/2025                  Interval Top: 7450 ft.    Interval Bottom: 7770 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/23/2010
Treatment Summary:CDL-NBRR COMPLETION. SET CFP @ 7820'. 12/09/2010 SET CBP @ 5000'. 12/13/2010. DRILLED OUT CBP @ 5000'. 12/15/2010. DRILLED OUT CFP @ 7820'. 12/15/2010. SET CFP @ 7900. 12/21/2010. FRAC'D THE CODELL WITH 92,988 GAL 22# TO 28# VISTAR HYBRID CROSS LINKED GEL CONTAINING 176,320 # 20/40 SAND. 12/23/10. SET CFP @ 7660'. 12/23/2010. SET CBP @ 7630'. 02/12/2011. FRAC'D THE NIOBRARA WITH 143,136 GALS 18# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,760 # 20/40 SAND. 02/17/2011.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7450 ft.# Of Holes:364
Interval Bottom:7770 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2024 - 12/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2024 - December 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)56
GOR
GOR DeterminationMCFE
Average BOE per Day0.025
Average MCFE per Day0.153

 Federal Financial Assurance  i 

 Tribal Well  i No