|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 6/6/2024 Measured TD: 8510 ft. Vertical TD: 8268 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 6/6/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20070468 | Expiration Date: | 3/5/2008 | Proposed Top PZ Location: | Sec:11 Twp: 1N 69W | Footage: 2129 FNL 589 FWL | Bottom Hole Location: | Sec:11 Twp: 1N 69W | Footage: 2129 FNL 589 FWL | Proposed Depth/Form: | 8468 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NW | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: N2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5272 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 230, Top: 4323 ft., Bottom: 5272 ft. |
| | |
Wellbore Completed | Completion Date: | 5/23/2007 | Spud Date: | 5/15/2007 | Spud Date Is: | ACTUAL | Measured TD: | 8510 ft. | Measured PB depth: | 8382 ft. | True Vertical TD: | 8268 ft. | True Vertical PB depth: | 8140 ft. | Top PZ Location: | Sec:11 Twp: 1N 69W | Footage: 2129 FNL 589 FWL | Bottom Hole Location: | Sec:11 Twp: 1N 69W | Footage: 2129 FNL 589 FWL | Log Types: | CBL, CCL, VDL, GAMMA RAY | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 851 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 440, Top: 0 ft., Bottom: 851 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8496 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 320, Top: 6650 ft., Bottom: 8496 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5470 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 190, Top: 5085 ft., Bottom: 5470 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4678 ft. | | N | N | SHANNON | 5082 ft. | | N | N | NIOBRARA | 7550 ft. | | N | N | CODELL | 7922 ft. | | N | N | J SAND | 8340 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 6/6/2024 Interval Top: 8340 ft. Interval Bottom: 8374 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/1/2007 | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND W/ 238,620# SAND, 12,000# 20/40 SUPER LC. 180,848 GAL FRAC FLUID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8340 ft. | # Of Holes: | 44 | Interval Bottom: | 8374 ft. | Hole Size: | 0.73 in. |
|
Formation CODL Formation Classification: GW Status: CM - 1/29/2024 Interval Top: 7922 ft. Interval Bottom: 7938 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7922 ft. | # Of Holes: | 64 | Interval Bottom: | 7938 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/12/2007 Interval Top: 7550 ft. Interval Bottom: 8374 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.219 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/27/2007 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7800' AND 8020' TO COMMINGLE THE JSND-NBRR-CDL |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8328 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/12/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 91 | BBLS_OIL | 56 | CALC_BBLS_H2O | 91 | CALC_BBLS_OIL | 56 | CALC_GOR | 2536 | CALC_MCF_GAS | 142 | CASING_PRESS | 356 | MCF_GAS | 142 |
| Perforation Data: | Interval Top: | 7550 ft. | # Of Holes: | 156 | Interval Bottom: | 8374 ft. | Hole Size: | 0.73 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/6/2024 Interval Top: 7550 ft. Interval Bottom: 7938 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/1/2007 | Treatment Summary: | NBRR-CDL RECOMPLETION SET CFP @ 8020' 6/01/07 FRAC'D THE CODELL W/ 238,340# SAND, 12,000 20/40 SUPER LC, 117,090 GAL FRAC FLUID// SET CFP @ 7800" 06/01/07 FRAC'D THE NIOBRARA W/ 238,880# 20/40 SAND, 174,847 GAL FRAC FLUID, 12,000# SUPER LC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7550 ft. | # Of Holes: | 112 | Interval Bottom: | 7938 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/29/2024 Interval Top: 7550 ft. Interval Bottom: 7700 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7550 ft. | # Of Holes: | 48 | Interval Bottom: | 7700 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 06/06/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2028 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|