|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2023 Measured TD: 8135 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20064983 | Expiration Date: | 11/12/2007 | | Proposed Depth/Form: | 8144 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4000 ft., Bottom: 5000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/10/2007 | | Spud Date: | 1/30/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8135 ft. | Measured PB depth: | 8112 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL ; CD/CN/DI | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 713 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 415, Top: 0 ft., Bottom: 713 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8113 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 6520 ft., Bottom: 8113 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5156 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 345, Top: 3864 ft., Bottom: 5156 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4217 ft. | | N | N | | SHANNON | 4733 ft. | | N | N | | NIOBRARA | 7268 ft. | | N | N | | CODELL | 7571 ft. | | N | N | | J SAND | 8006 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 4/1/2023 Interval Top: 8022 ft. Interval Bottom: 8038 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/6/2007 | | Treatment Summary: | JSND COMPLETION FRAC'D THE J SAND WITH 172,536 GAL FRAC AND 251,100# SAND. 3/06/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8022 ft. | # Of Holes: | 32 | | Interval Bottom: | 8038 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/10/2007 Interval Top: 7344 ft. Interval Bottom: 8038 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/10/2007 | | Treatment Summary: | JSND-NBRR-CODL COMMINGLE DRILLED UP CFP@7450' AND 7670' TO COMMINGLE THE JSND - NBRR - CODL 3/20/07 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8003 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/10/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 63 | | BBLS_OIL | 30 | | BTU_GAS | 1216 | | CALC_BBLS_H2O | 63 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 250067 | | CALC_MCF_GAS | 502 | | MCF_GAS | 502 |
| | Perforation Data: | | Interval Top: | 7344 ft. | # Of Holes: | 144 | | Interval Bottom: | 8038 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 4/1/2023 Interval Top: 7344 ft. Interval Bottom: 7592 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/6/2007 | | Treatment Summary: | NB-CD RECOMPLETION SET CFP@7670'. 03/06/07. FRAC'D THE CODL W/111,755 GAL FRC FLUID AND 250,500# 30/50 SAND. 3/6/07 SET CFP@7450'. 3/6/07. FRAC'D THE NBRR W/158,676 GAL FRAC FLUID AND 250,100# 30/50 SAND. 3/6/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7344 ft. | # Of Holes: | 112 | | Interval Bottom: | 7592 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 189 |
| Total Gas Produced (MCF) | 6079 |
| GOR | 32164 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.388 |
| Average MCFE per Day | 19.638 |
| Federal Financial Assurance | i | |
|
|