Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06449
Well Classification: GW Status: PR - 7/1/2017
Well Name/No:WHEELER 'G' UNIT #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2017
FacilityID:206954LocationID:321440
County:BOULDER #013Location:NENE 1 1N69W 6
Field:WATTENBERG - #90750Elevation:4952 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1173FNL  958 FELLat/Long: 40.084197 / -105.058868Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.084300 / -105.058782Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2017             Measured TD: 8135 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2017
Wellbore Permit
Permit #:19941017 Expiration Date:8/5/1995
Proposed Depth/Form:8250 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NBCSN , Formation: NIOBRARA-CODELL-SHANNON , Order: 316&320 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:5/18/1995
Spud Date:2/1/1995Spud Date Is:ACTUAL
Measured TD:8135 ft.Measured PB depth:8098 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DIL, FDC/GR HI RES, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 819 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 420 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8135 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 615, Top: 4450 ft., Bottom: 8135 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4265 ft.
SHANNON4840 ft.
NIOBRARA7251 ft.
CODELL7581 ft.
J SAND8009 ft.

Formation JSND                     Formation Classification:  GW                     Status:  PR - 7/1/2017                  Interval Top: 8013 ft.    Interval Bottom: 8041 ft.

 Completed Information for Formation J SAND
1st Production Date:2/22/1995Choke Size:0.438 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:5/18/1995
Treatment Summary:FRAC W/ 530,000# 20/40 M IN 181,398 GAL FLUID
Tubing Size:2.375 in.Tubing Setting Depth:7982 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/5/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 5
CALC_GOR 77600
CASING_PRESS 340
MCF_GAS 388
TUBING_PRESS 50
Perforation Data:
Interval Top:8013 ft.# Of Holes:56
Interval Bottom:8041 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/1/1999                  Interval Top: 7353 ft.    Interval Bottom: 8041 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:5/18/1995Choke Size:0.281 in.
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7982 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/19/1995Test Method:FLOWBACK
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 24
BBLS_OIL 54
CALC_GOR 1481
CASING_PRESS 740
MCF_GAS 80
TUBING_PRESS 200
Perforation Data:
Interval Top:7353 ft.# Of Holes:73
Interval Bottom:8041 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 7/1/2017                  Interval Top: 7353 ft.    Interval Bottom: 7600 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/18/1995
Treatment Summary:FRAC W/ 420,000# 20/40 M IN 124,110 GAL FLUID
Tubing Size:2.375 in.Tubing Setting Depth:7982 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7353 ft.# Of Holes:17
Interval Bottom:7600 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)558
Total Gas Produced (MCF)13750
GOR24641
GOR DeterminationMCFE
Average BOE per Day8.032
Average MCFE per Day46.566

 Federal Financial Assurance  i 

 Tribal Well  i No