|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2026 Measured TD: 8661 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2026 | | Wellbore Permit | | | Permit #: | 20030189 | Expiration Date: | 2/9/2004 | | Proposed Depth/Form: | 8800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2NE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 849 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 410, Top: 0 ft., Bottom: 849 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8268 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 6978 ft., Bottom: 8268 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/6/2003 | | Spud Date: | 5/9/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 8661 ft. | Measured PB depth: | 8653 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR, C B L | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 849 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 410, Top: 0 ft., Bottom: 849 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8268 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 6980 ft., Bottom: 8268 ft., Determination Method: | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 8180 ft., Depth: 8658 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 9, Top: 8265 ft., Bottom: 8658 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4782 ft. | | | | | NIOBRARA | 7630 ft. | | N | N | | FORT HAYS | 8088 ft. | | N | N | | CODELL | 8110 ft. | | N | N | | J SAND | 8540 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 1/1/2026 Interval Top: 8536 ft. Interval Bottom: 8565 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | 0.438 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/6/2003 | | Treatment Summary: | 138,642 GALS SILVERSTIM 24# GEL & 447,020# 20/40 SAND, 5/28/03 COMMINGLED W/CODELL AND NIOBRARA |
| | Tubing Size: | 1.5 in. | Tubing Setting Depth: | 8514 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/18/2003 | Test Method: | FLOWIN | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 2 | | BTU_GAS | 1171 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 125000 | | CALC_MCF_GAS | 250 | | CASING_PRESS | 680 | | GRAVITY_OIL | 54 | | MCF_GAS | 250 | | TUBING_PRESS | 380 |
| | Perforation Data: | | Interval Top: | 8536 ft. | # Of Holes: | 76 | | Interval Bottom: | 8565 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/18/2003| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/6/2003 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JNBCD. |
| | No Perforation Data was found for formation JNBCD. |
|
Formation NB-CD Formation Classification: GW Status: SI - 1/1/2026| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/14/1993 | Choke Size: | 1,864.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 136 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.064 |
| Average MCFE per Day | 0.376 |
| Federal Financial Assurance | i | |
|
|