|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/3/2020 Measured TD: 8463 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/3/2020 | | Wellbore Permit | DRIFTED | | Permit #: | 19921482 | Expiration Date: | 10/27/1993 | | Proposed Depth/Form: | 8497 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SW4 |
| | |
| Wellbore Completed | | Completion Date: | 8/16/1994 | | Spud Date: | 12/4/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 8463 ft. | Measured PB depth: | 8463 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DIL/CNDL/CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 680 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 680 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8463 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 7310 ft., Bottom: 8463 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7400 ft. | | | | | CODELL | 7887 ft. | | | | | J SAND | 8297 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 3/3/2020 Interval Top: 8298 ft. Interval Bottom: 8322 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/6/1993 | Choke Size: | 0.156 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/16/1994 | | Treatment Summary: | 22,000# 100 M, 480,000# 20/40 M |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7872 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/10/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 87 | | BBLS_OIL | 4 | | CALC_GOR | 60000 | | CASING_PRESS | 650 | | GRAVITY_OIL | 46 | | MCF_GAS | 240 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 8298 ft. | # Of Holes: | 19 | | Interval Bottom: | 8322 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/13/1998 Interval Top: 7461 ft. Interval Bottom: 8322 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/13/1998 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/16/1994 | | Treatment Summary: | REMOVED CIBP AND COMMINGLED JNBCD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8284 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/13/1998 | Test Method: | PLUNGER | | Hours Tested: | 2 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 18 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 173 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 31500 | | CALC_MCF_GAS | 605 | | CASING_PRESS | 950 | | GRAVITY_OIL | 60 | | MCF_GAS | 63 | | TUBING_PRESS | 800 |
| | Perforation Data: | | Interval Top: | 7461 ft. | # Of Holes: | 32 | | Interval Bottom: | 8322 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/3/2020 Interval Top: 7461 ft. Interval Bottom: 7903 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/21/1994 | Choke Size: | 0.406 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/16/1994 | | Treatment Summary: | 95,560 GAL PURGEL HT 35/30 CROSSLINKED GEL CONTAINING 10,000# 100 M & 325,000# 20/40 M |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7872 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/22/1994 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | CALC_GOR | 4650 | | CASING_PRESS | 150 | | GRAVITY_OIL | 52 | | MCF_GAS | 93 |
| | Perforation Data: | | Interval Top: | 7461 ft. | # Of Holes: | 13 | | Interval Bottom: | 7903 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/03/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|