|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2025 Measured TD: 8688 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2025 | | Wellbore Permit | | | Permit #: | 20042142 | Expiration Date: | 9/21/2005 | | Proposed Depth/Form: | 8750 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 728 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 385, Top: 0 ft., Bottom: 728 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8282 ft., Weight: 7.7 , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 6490 ft., Bottom: 8282 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/14/2005 | | Spud Date: | 7/12/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8688 ft. | Measured PB depth: | 8681 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL | | Log Types: | DIL, CNDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 728 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 385, Top: 0 ft., Bottom: 728 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8282 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 6490 ft., Bottom: 8282 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: , Size: 2.875 in., Top: 8185 ft., Depth: 8688 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 10, Top: 8216 ft., Bottom: 8688 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7640 ft. | | N | N | | FORT HAYS | 8085 ft. | | N | N | | CODELL | 8105 ft. | | N | N | | J SAND | 8545 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 8522 ft. Interval Bottom: 8548 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/14/2005 | | Treatment Summary: | PERF J SAND 8522-8526' & 8535-8548' (68 HOLES), 7/21/05. FRAC JSND W/69,048 GAL SILVERSTIM 24# GEL; 213,460# 20/40 OTTAWA SAND & 12,000# 16/30 SB EXCEL, 8/5/05. COMMINGLE W/CODELL & NIOBRARA, 8/14/05. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8522 ft. | # Of Holes: | 68 | | Interval Bottom: | 8548 ft. | Hole Size: | 0.29 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 7691 ft. Interval Bottom: 8117 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/14/2005 | | Treatment Summary: | MAGMA FIBERS (3SX) ACROSS CODELL & NIOBRARA PERFS, 7/11/2005; COMMINGLE W/J SAND 8/14/05. TEST INFO JSND-NB-CD |
| | Tubing Size: | 1.5 in. | Tubing Setting Depth: | 8497 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/24/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 0 | | BTU_GAS | 1145 | | CALC_BBLS_H2O | 12 | | CALC_GOR | 0 | | CALC_MCF_GAS | 212 | | CASING_PRESS | 820 | | GRAVITY_OIL | 48 | | MCF_GAS | 212 | | TUBING_PRESS | 810 |
| | Perforation Data: | | Interval Top: | 7691 ft. | # Of Holes: | 11 | | Interval Bottom: | 8117 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 26 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.011 |
| Average MCFE per Day | 0.071 |
| Federal Financial Assurance | i | |
|
|