Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-009-06483
Well Classification: OW Status: TA - 7/6/2023
Well Name/No:S.E. CAMPO UNIT #602
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:MURFIN DRILLING COMPANY INC - 61650
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:8100
Facility Status:TAStatus Date7/6/2023
FacilityID:206067LocationID:321110
County:BACA #009Location:SENW 1 35S46W 6
Field:CAMPO - #9850Elevation:4160 ft.
Basin:HUGOTON EMBAYMENT  
Planned Location:1650FNL  1650 FWLLat/Long: 37.028175 / -102.555349Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.028210 / -102.555361Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 7/6/2023             Measured TD: 0 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 7/6/2023
Wellbore Permit
Permit #:19900141 Expiration Date:6/16/1990
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: LNSNG , Formation: LANSING , Order: 0 , Unit Acreage: 40, Drill Unit: SENW

Wellbore Completed
Completion Date:7/15/1990
Spud Date:5/19/1990Spud Date Is:ACTUAL
Measured TD:0 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DUAL INDUCTION , SPECTRAL DENSITY NEUTRON; MICRO LOG
Casing:String Type: CONDUCTOR, Hole Size: 37 in., Size: 21 in., Top: , Depth: 40 ft., Weight: UNK , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1790 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 735, Top: 0 ft., Bottom: 1790 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.625 in., Size: 5.5 in., Top: , Depth: 4248 ft., Weight: 14 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 2998 ft., Bottom: 4199 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 2998 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 2998 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
GLORIETA1489 ft.0 ft.
LANSING3960 ft.

Formation LNSNG                   Formation Classification:  OW                   Status:  TA - 7/6/2023                  Interval Top: 3960 ft.    Interval Bottom: 3978 ft.

 Completed Information for Formation LANSING
1st Production Date:6/28/1990Choke Size: 
Formation Name:LANSINGCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/1990
Treatment Summary:SEE SCANNED DOC #638417
Tubing Size:2.375 in.Tubing Setting Depth:4029 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 103
CASING_PRESS 100
GRAVITY_OIL 42.7
MCF_GAS 45
Perforation Data:
Interval Top:3960 ft.# Of Holes:72
Interval Bottom:3978 ft.Hole Size:0.5 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY12/26/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveYNoticed Date
06/06/2023
Defined Inactive (TA )YDefined Inactive
12/31/2018
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No