|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/28/2024 Measured TD: 18232 ft. Vertical TD: 7687 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/28/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | N/A | | Proposed Top PZ Location: | Sec:30 Twp: 4S 64W | Footage: 1060 FSL 330 FWL | | Bottom Hole Location: | Sec:29 Twp: 4S 64W | Footage: 1060 FSL 330 FEL | | Proposed Depth/Form: | 18147 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1442 , Unit Acreage: 1298, Drill Unit: T4S R64W SEC 29: ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 105, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3250 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1323, Top: 0 ft., Bottom: 3250 ft. | | Casing: | String Type: 1ST, Hole Size: 8.2 in., Size: 5.5 in., Top: 0 ft., Depth: 18147 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2859, Top: , Bottom: 18147 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/22/2024 | | Spud Date: | 12/30/2023 | Spud Date Is: | ACTUAL | | Measured TD: | 18232 ft. | Measured PB depth: | 18222 ft. | | True Vertical TD: | 7687 ft. | True Vertical PB depth: | 7687 ft. | | Top PZ Location: | Sec:30 Twp: 4S 64W | Footage: 1073 FSL 410 FWL | | Bottom Hole Location: | Sec:29 Twp: 4S 64W | Footage: 1093 FSL 331 FEL | | Log Types: | CBL, MWD, (RES in API 005-07547 and 005-07553) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 36.95 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3296 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1375, Top: 0 ft., Bottom: 3296 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18222 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2905, Top: 135 ft., Bottom: 18222 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 5063 ft. | | N | N | | SUSSEX | 5358 ft. | | N | N | | SHANNON | 6262 ft. | | N | N | | SHARON SPRINGS | 7833 ft. | | N | N | | NIOBRARA | 7921 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 8/28/2024 Interval Top: 8284 ft. Interval Bottom: 18148 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/22/2024 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 4/9/2024 | Treatment End Date: | 4/19/2024 | | Treatment Summary: | Frac'd Niobrara with 57 stage plug and perf:
11441848 total pounds proppant pumped: 953608 pounds 40/70 mesh; 10488240 pounds 100 mesh;
473155 total bbls fluid pumped: 446385 bbls gelled fluid; 22675 bbls fresh water and 4095 bbls 15% HCl Acid.
| | Total fluid used in treatment (bbls): | 473155 | Max pressure during treatment (psi): | 8907 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 57 | | Total acid used in treatment (bbls): | 4095 | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 22675 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 11441848 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7911 ft. | | Tubing Packer Depth: | 7909 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/28/2024 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 399 | | BBLS_OIL | 362 | | BTU_GAS | 1400 | | CALC_BBLS_H2O | 399 | | CALC_BBLS_OIL | 362 | | CALC_GOR | 992 | | CALC_MCF_GAS | 359 | | CASING_PRESS | 985 | | GRAVITY_OIL | 40 | | MCF_GAS | 359 | | TUBING_PRESS | 1374 |
| | Perforation Data: | | Interval Top: | 8284 ft. | # Of Holes: | 2491 | | Interval Bottom: | 18148 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 99247 |
| Total Gas Produced (MCF) | 229794 |
| GOR | 2315 |
| GOR Determination | BOE |
| Average BOE per Day | 379.950 |
| Average MCFE per Day | 2203.660 |
| Federal Financial Assurance | i | |
|
|