Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07492
Well Classification: OW Status: PR - 10/1/2024
Well Name/No:State Pikes 4-65 #36-31-32 1BH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:1960.12
Facility Status:PRStatus Date10/1/2024
FacilityID:481118LocationID:467266
County:ARAPAHOE #005Location:SENE 35 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5870 ft.
Planned Location:1977FNL  600 FELLat/Long: 39.661891 / -104.624443Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/8/2022
End Date: 3/20/2022
Reported: 7/8/2022
Originally Reported: 3/31/2022
Days to report: 110
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2024             Measured TD: 19796 ft.    Vertical TD: 7883 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/18/2024
Proposed Top PZ Location:Sec:36 Twp: 4S 65W Footage: 1035 FNL  341 FWL
Bottom Hole Location:Sec:32 Twp: 4S 65W Footage: 1010 FNL  989 FWL
Proposed Depth/Form:19835 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1353 , Unit Acreage: 1444, Drill Unit: T4S R64W Section 31:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 447, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3268 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 1745, Top: 0 ft., Bottom: 3268 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19835 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2804, Top: , Bottom: 19835 ft.

Wellbore Completed
Completion Date:2/4/2022
Spud Date:1/13/2022Spud Date Is:ACTUAL
Measured TD:19796 ft.Measured PB depth:19785 ft.
True Vertical TD:7883 ft.True Vertical PB depth:7883 ft.
Top PZ Location:Sec:36 Twp: 4S 65WFootage: 1035 FNL  341 FWL
Bottom Hole Location:Sec:32 Twp: 4S 65WFootage: 1010 FNL  989 FWL
Log Types:CBL, MWD, (RESISTIVITY in 005-07295)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 123 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 123 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3352 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 0 ft., Bottom: 3352 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19785 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3110, Top: 328 ft., Bottom: 19785 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5433 ft.NN
SHANNON6276 ft.NN
SHARON SPRINGS7825 ft.NN
NIOBRARA7925 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2024                 Interval Top: 8460 ft.    Interval Bottom: 19666 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/18/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/8/2022Treatment End Date:3/20/2022
Treatment Summary:Frac'd Niobrara with 64 stage plug and perf: 12801219 total pounds proppant pumped: 12333069 pounds 40/70 mesh; 468150 pounds 100 mesh. 525603 total bbls fluid pumped: 502273 bbls gelled fluid; 18727 bbls fresh water and 4603 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):525603Max pressure during treatment (psi):8671
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:64
Total acid used in treatment (bbls):4603Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2962
Fresh water used in treatment (bbls):18727Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12801219Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8218 ft.
Tubing Packer Depth:8216 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2022Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 445
BBLS_OIL 303
BTU_GAS 1400
CALC_BBLS_H2O 445
CALC_BBLS_OIL 303
CALC_GOR 653
CALC_MCF_GAS 198
CASING_PRESS 1400
GRAVITY_OIL 40
MCF_GAS 198
TUBING_PRESS 1850
Perforation Data:
Interval Top:8460 ft.# Of Holes:2808
Interval Bottom:19666 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)13534
Total Gas Produced (MCF)5131
GOR379
GOR DeterminationBOE
Average BOE per Day39.859
Average MCFE per Day231.180

 Federal Financial Assurance  i 

 Tribal Well  i No