|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: WO - 12/1/2021 Measured TD: 7658 ft. Vertical TD: 7622 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW WO - 12/1/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 1/22/2022 | Proposed Top PZ Location: | Sec:29 Twp: 4S 65W | Footage: 1150 FSL 460 FEL | Bottom Hole Location: | Sec:30 Twp: 4S 65W | Footage: 1150 FSL 460 FWL | Proposed Depth/Form: | 17935 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1167 , Unit Acreage: 3840, Drill Unit: S. 17,18,19,20,29,30 | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 99 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 86, Top: 0 ft., Bottom: 99 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2301 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 1238, Top: 0 ft., Bottom: 2301 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17935 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2598, Top: , Bottom: 17935 ft. |
| | |
Wellbore Completed | Completion Date: | 6/26/2021 | Spud Date: | 6/7/2021 | Spud Date Is: | ACTUAL | Measured TD: | 7658 ft. | Measured PB depth: | 7290 ft. | True Vertical TD: | 7622 ft. | True Vertical PB depth: | 7276 ft. | Top PZ Location: | Sec:28 Twp: 4S 65W | Footage: 1194 FSL 117 FWL | Bottom Hole Location: | Sec:28 Twp: 4S 65W | Footage: 1194 S 117 W | Log Types: | MWD/LWD, Mud, (Triple Combination on 005-07270). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2381 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 1131, Top: 0 ft., Bottom: 2381 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 2381 ft., Depth: 7658 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: 1ST , Top: 7204 ft., Depth: 7658 ft., Bottom: 7658 ft., Sacks: 117, Method: | Additional Cement: | String Type: 1ST , Top: 7300 ft., Depth: 7658 ft., Bottom: 7658 ft., Sacks: 132, Method: | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 45 ft., Bottom: 45 ft., Sacks: 12, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | | | N | N | DENVER | 24 ft. | 1523 ft. | N | N | LARAMIE | 1523 ft. | 1869 ft. | N | N | FOX HILLS | 1869 ft. | 2086 ft. | N | N | PIERRE | 2086 ft. | | N | N | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 11/22/2022 Measured TD: 18065 ft. Vertical TD: 8068 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 11/22/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/28/2024 | Proposed Top PZ Location: | Sec:29 Twp: 4S 65W | Footage: 1150 FSL 460 FEL | Bottom Hole Location: | Sec:30 Twp: 4S 65W | Footage: 1150 FSL 460 FWL | Proposed Depth/Form: | 18027 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1167 , Unit Acreage: 3840, Drill Unit: S. 17,18,19,20,29,30 | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 70, Top: 0 ft., Bottom: 104 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2381 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 1131, Top: 0 ft., Bottom: 2381 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18027 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2599, Top: , Bottom: 18027 ft. |
| | |
Wellbore Completed | Completion Date: | 7/3/2021 | Spud Date: | 6/7/2021 | Spud Date Is: | ACTUAL | Measured TD: | 18065 ft. | Measured PB depth: | 18034 ft. | True Vertical TD: | 8068 ft. | True Vertical PB depth: | 8068 ft. | Top PZ Location: | Sec:29 Twp: 4S 65W | Footage: 1082 FSL 472 FEL | Bottom Hole Location: | Sec:30 Twp: 4S 65W | Footage: 1163 S 465 W | Log Types: | CBL, MWD/LWD, Mud, (Triple Combination on 005-07270). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2381 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 1131, Top: 0 ft., Bottom: 2381 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18047 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2572, Top: 2335 ft., Bottom: 18047 ft., Determination Method: CBL | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 45 ft., Bottom: 45 ft., Sacks: 12, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | DENVER | 24 ft. | 1523 ft. | N | N | LARAMIE | 1523 ft. | 1869 ft. | N | N | FOX HILLS | 1869 ft. | 2086 ft. | N | N | PIERRE | 2086 ft. | 7891 ft. | N | N | NIOBRARA | 7891 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 11/22/2022 Interval Top: 8427 ft. Interval Bottom: 18022 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/14/2021 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 10/18/2021 | Treatment End Date: | 11/5/2021 | Treatment Summary: | Frac'd Niobrara with 52 stage plug and perf;
437212 total bbls fluid pumped: 417142 bbls gelled fluid, 16333 bbls fresh water, and 3737 bbls 15% HCl acid;
10581495 total lbs proppant pumped: 10186355 lbs 40/70 mesh and 395140 lbs 100 mesh. | Total fluid used in treatment (bbls): | 437212 | Max pressure during treatment (psi): | 8964 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 52 | Total acid used in treatment (bbls): | 3737 | Min frac gradient (psi/ft): | 0.86 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 745 | Fresh water used in treatment (bbls): | 16333 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 10581495 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7985 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/15/2021 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 621 | BBLS_OIL | 60 | BTU_GAS | 1455 | CALC_BBLS_H2O | 621 | CALC_BBLS_OIL | 60 | CALC_GOR | 533 | CALC_MCF_GAS | 32 | CASING_PRESS | 450 | GRAVITY_OIL | 41 | MCF_GAS | 32 | TUBING_PRESS | 2350 |
| Perforation Data: | Interval Top: | 8427 ft. | # Of Holes: | 2260 | Interval Bottom: | 18022 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 42132 |
Total Gas Produced (MCF) | 181517 |
GOR | 4308 |
GOR Determination | BOE |
Average BOE per Day | 200.746 |
Average MCFE per Day | 1164.344 |
Federal Financial Assurance | i | |
|
|