|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/11/2021 Measured TD: 18438 ft. Vertical TD: 7821 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/11/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/22/2022 | Proposed Top PZ Location: | Sec:28 Twp: 4S 65W | Footage: 360 FSL 330 FWL | Bottom Hole Location: | Sec:27 Twp: 4S 65W | Footage: 360 FSL 330 FEL | Proposed Depth/Form: | 18355 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1255 , Unit Acreage: 1280, Drill Unit: Sections 27 & 28 | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 99 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 86, Top: 0 ft., Bottom: 99 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2328 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 1253, Top: 0 ft., Bottom: 2328 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18355 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2671, Top: , Bottom: 18355 ft. |
| | |
Wellbore Completed | Completion Date: | 7/16/2021 | Spud Date: | 6/7/2021 | Spud Date Is: | ACTUAL | Measured TD: | 18438 ft. | Measured PB depth: | 18404 ft. | True Vertical TD: | 7821 ft. | True Vertical PB depth: | 7821 ft. | Top PZ Location: | Sec:28 Twp: 4S 65W | Footage: 345 FSL 330 FWL | Bottom Hole Location: | Sec:27 Twp: 4S 65W | Footage: 361 S 335 E | Log Types: | CBL, MWD/LWD, Mud, (Triple Combination on 005-07270). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 30, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2384 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 1153, Top: 0 ft., Bottom: 2384 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18417 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2661, Top: 2200 ft., Bottom: 18417 ft., Determination Method: CBL | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 26 ft., Bottom: 26 ft., Sacks: 11, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | DENVER | 24 ft. | 1500 ft. | N | N | LARAMIE | 1500 ft. | 1800 ft. | N | N | FOX HILLS | 1800 ft. | 2000 ft. | N | N | PIERRE | 2000 ft. | 8044 ft. | N | N | NIOBRARA | 8044 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 12/11/2021 Interval Top: 8495 ft. Interval Bottom: 18391 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/3/2021 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 10/18/2021 | Treatment End Date: | 10/27/2021 | Treatment Summary: | 466061 bbls of water, 176 bbls of additives (FRP-22G, Bardac 2250M, T-Chlor 12.5, ACI-97, ASF-67) and 1991 bbl HCL in a 55 stage frac with 41486 Ibs of DFR-2S and 112199 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 468228 | Max pressure during treatment (psi): | 8805 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 55 | Total acid used in treatment (bbls): | 1991 | Min frac gradient (psi/ft): | 0.86 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 3983 | Fresh water used in treatment (bbls): | 466237 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8077 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/11/2021 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1841 | BBLS_OIL | 945 | BTU_GAS | 1405 | CALC_BBLS_H2O | 1841 | CALC_BBLS_OIL | 945 | CALC_GOR | 669 | CALC_MCF_GAS | 632 | CASING_PRESS | 950 | GRAVITY_OIL | 41 | MCF_GAS | 632 | TUBING_PRESS | 1600 |
| Perforation Data: | Interval Top: | 8495 ft. | # Of Holes: | 2393 | Interval Bottom: | 18391 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 21424 |
Total Gas Produced (MCF) | 108376 |
GOR | 5058 |
GOR Determination | BOE |
Average BOE per Day | 109.640 |
Average MCFE per Day | 635.889 |
Federal Financial Assurance | i | |
|
|