Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07377
Well Classification: OW Status: PR - 2/1/2025
Well Name/No:Property Reserve 4-65 3-4 #2DH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:456532LocationID:456535
Municipality/County:AURORA / ARAPAHOE #005Location:SENE 3 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5613 ft.
Planned Location:2308FNL  425 FELLat/Long: 39.733558 / -104.642214Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.733558 / -104.642215Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/19/2019
End Date: 5/29/2019
Reported: 7/1/2019
Days to report: 33
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2025             Measured TD: 17855 ft.    Vertical TD: 7944 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/11/2020
Proposed Top PZ Location:Sec:3 Twp: 4S 65W Footage: 2467 FNL  728 FEL
Bottom Hole Location:Sec:4 Twp: 4S 65W Footage: 2457 FNL  331 FWL
Proposed Depth/Form:17870 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-906 , Unit Acreage: 1280, Drill Unit: Sec 3 and 4 All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2142 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 2142 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17870 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 2240, Top: 2142 ft., Bottom: 17870 ft.

Wellbore Completed
Completion Date:12/7/2018
Spud Date:11/3/2018Spud Date Is:ACTUAL
Measured TD:17855 ft.Measured PB depth:17746 ft.
True Vertical TD:7944 ft.True Vertical PB depth:7943 ft.
Top PZ Location:Sec:3 Twp: 4S 65WFootage: 2467 FNL  728 FEL
Bottom Hole Location:Sec:4 Twp: 4S 65WFootage: 2457 FNL  331 FWL
Log Types:MWD/LWD; Mud Log; CBL; (Resistivity in API 005-07379)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 126 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: 126 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.625 in., Size: 9.625 in., Top: 0 ft., Depth: 2202 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 745, Top: 0 ft., Bottom: 2211 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17830 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 2350, Top: 970 ft., Bottom: 17855 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1716 ft.
PIERRE1948 ft.
SUSSEX7193 ft.
SHANNON7468 ft.
SHARON SPRINGS7666 ft.
NIOBRARA7732 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2025                  Interval Top: 8315 ft.    Interval Bottom: 17666 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/12/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/19/2019Treatment End Date:5/29/2019
Treatment Summary:1,417 bbls of 15% HCl Acid 285,112 bbls of FR Water 1,286 bbls of 7.5% HCl Acid 1,304,993 pounds of 100 Mesh 11,803,231 pounds of 40/70 White
Total fluid used in treatment (bbls):287815Max pressure during treatment (psi):9234
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):2703Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8009
Fresh water used in treatment (bbls):285112Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13108224Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:17563 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 574
BBLS_OIL 1015
CALC_BBLS_H2O 574
CALC_BBLS_OIL 1015
CALC_GOR 1227
CALC_MCF_GAS 1246
CASING_PRESS 1100
GRAVITY_OIL 42
MCF_GAS 1246
TUBING_PRESS 717
Perforation Data:
Interval Top:8315 ft.# Of Holes:1239
Interval Bottom:17666 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2024 - May 2025i
Total Oil Produced (Barrels)8217
Total Gas Produced (MCF)503
GOR61
GOR DeterminationBOE
Average BOE per Day22.741
Average MCFE per Day131.893

 Federal Financial Assurance  i 

 Tribal Well  i No