Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07366
Well Classification: OW Status: SI - 5/1/2024
Well Name/No:Chico 4-65 26-25 #2BH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2024
FacilityID:455195LocationID:455198
Municipality/County:AURORA / ARAPAHOE #005Location:SWNW 26 4S65W 6
Field:WILDCAT - #99999Elevation:5796 ft.
Planned Location:2110FNL  525 FWLLat/Long: 39.676178 / -104.639045Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.676179 / -104.639045Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/22/2019
End Date: 5/4/2019
Reported: 7/1/2019
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 5/1/2024             Measured TD: 17932 ft.    Vertical TD: 7833 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 5/1/2024
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:5/24/2020
Proposed Top PZ Location:Sec:26 Twp: 4S 65W Footage: 1858 FNL  757 FWL
Bottom Hole Location:Sec:25 Twp: 4S 65W Footage: 1835 FNL  349 FEL
Proposed Depth/Form:18006 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-937 , Unit Acreage: 1280, Drill Unit: All S25, All S26
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2236 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 610, Top: 0 ft., Bottom: 2236 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18006 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 2250, Top: 2236 ft., Bottom: 18006 ft.

Wellbore Completed
Completion Date:10/30/2018
Spud Date:10/4/2018Spud Date Is:ACTUAL
Measured TD:17932 ft.Measured PB depth:17825 ft.
True Vertical TD:7833 ft.True Vertical PB depth:7833 ft.
Top PZ Location:Sec:26 Twp: 4S 65WFootage: 1858 FNL  757 FWL
Bottom Hole Location:Sec:25 Twp: 4S 65WFootage: 1835 FNL  349 FEL
Log Types:LWD/MWD; Mud Log; CBL; (Resistivity in API 005-07368)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 125 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 125 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2306 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 2320 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17912 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 2365, Top: 542 ft., Bottom: 17932 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1841 ft.
PIERRE2036 ft.
SUSSEX7375 ft.
SHANNON7598 ft.
SHARON SPRINGS7810 ft.
NIOBRARA7929 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 5/1/2024                  Interval Top: 8490 ft.    Interval Bottom: 17740 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/17/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/22/2019Treatment End Date:5/4/2019
Treatment Summary:2,848 bbls of 15% HCl Acid 11,409 bbls of Fresh Water 323,250 bbls of FR Water 1,274,950 pounds of 100 Mesh 11,353,000 pounds of 40/70 White
Total fluid used in treatment (bbls):337507Max pressure during treatment (psi):9127
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.36
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):2848Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1014
Fresh water used in treatment (bbls):334659Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12627950Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8340 ft.
Tubing Packer Depth:8333 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/25/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 753
BBLS_OIL 907
BTU_GAS 1572
CALC_BBLS_H2O 753
CALC_BBLS_OIL 907
CALC_GOR 988
CALC_MCF_GAS 896
CASING_PRESS 1
GRAVITY_OIL 43
MCF_GAS 896
TUBING_PRESS 1030
Perforation Data:
Interval Top:8490 ft.# Of Holes:1230
Interval Bottom:17740 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)789
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day2.192
Average MCFE per Day12.711

 Federal Financial Assurance  i 

 Tribal Well  i No