Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07343
Well Classification: OW Status: PR - 6/1/2020
Well Name/No:Buckskin #5-64 15-16-1BHZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TRUE OIL LLC - 90450
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:89/6121-S
Facility Status:PRStatus Date6/1/2020
FacilityID:454168LocationID:449920
County:ARAPAHOE #005Location:NESE 15 5S64W 6
Field:WILDCAT - #99999Elevation:5938 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2380FSL  440 FELLat/Long: 39.614805 / -104.530993Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.614805 / -104.530994Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/18/2018
End Date: 8/30/2018
Reported: 11/5/2018
Days to report: 67
Disclosure: Sidetrack #00
Start Date: 11/13/2018
End Date: 12/7/2018
Reported: 6/5/2019
Originally Reported: 1/2/2019
Days to report: 180
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2020             Measured TD: 17997 ft.    Vertical TD: 7761 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/1/2020
Proposed Top PZ Location:Sec:15 Twp: 5S 64W Footage: 1645 FNL  708 FEL
Bottom Hole Location:Sec:16 Twp: 5S 64W Footage: 1647 FNL  100 FWL
Proposed Depth/Form:18027 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-950 , Unit Acreage: 1280, Drill Unit: 15 & 16: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 40, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 872, Top: 0 ft., Bottom: 2100 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18027 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2696, Top: 0 ft., Bottom: 18027 ft.

Wellbore Completed
Completion Date:5/24/2018
Spud Date:4/21/2018Spud Date Is:ACTUAL
Measured TD:17997 ft.Measured PB depth:17967 ft.
True Vertical TD:7761 ft.True Vertical PB depth:7761 ft.
Top PZ Location:Sec:15 Twp: 5S 64WFootage: 1645 FNL  708 FEL
Bottom Hole Location:Sec:16 Twp: 5S 64WFootage: 1647 FNL  100 FWL
Log Types:Mud Log, MWD, CBL. (Resistivity in API# 005-07269).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 216, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2105 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 795, Top: 0 ft., Bottom: 2115 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17994 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2495, Top: 750 ft., Bottom: 17997 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5257 ft.NN
SHANNON5753 ft.NN
SHARON SPRINGS7616 ft.NN
NIOBRARA7768 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2020                  Interval Top: 8293 ft.    Interval Bottom: 11933 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/4/2019Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/11/2018Treatment End Date:11/15/2018
Treatment Summary:A 21 stage frac was performed using 66,929 bbl of FR Water, 3,233 bbls of PD Treated Water, 41,629 bbls of 25# Hybor G, 289 bbls of 15% HCl Acid, 933,520 pounds of 100 Mesh & 4,956,312 pounds of 30/50 proppant. 33 stages were frac'ed earlier in this well prior to shuting down due to lack of water.
Total fluid used in treatment (bbls):112080Max pressure during treatment (psi):4204
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):289Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):3233Total flowback volume recovered (bbls):19868
Fresh water used in treatment (bbls):108558Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5889832Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/18/2018Treatment End Date:8/30/2018
Treatment Summary:Completed 34 out of a planned 55 stages due to lack of water available. 99,721 bbls of FR Water, 12,066 bbls of PD Treated Water, 312 bbls of 25# Linear Gel, 64,301 bbls of 25# Hybor G, 620 bbls of 15% HCl Acid, 1,322,525 pounds of 100 Mesh, 6,280,820 pounds of 30/50 and 1,224,410 pounds of 40/70.
Total fluid used in treatment (bbls):177019Max pressure during treatment (psi):4307
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:34
Total acid used in treatment (bbls):620Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):12066Total flowback volume recovered (bbls):13692
Fresh water used in treatment (bbls):164333Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8827755Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:7515 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/2/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 711
BBLS_OIL 329
BTU_GAS 1431
CALC_BBLS_H2O 711
CALC_BBLS_OIL 329
CALC_GOR 802
CALC_MCF_GAS 264
CASING_PRESS 1280
GRAVITY_OIL 45
MCF_GAS 264
TUBING_PRESS 770
Perforation Data:
Interval Top:8293 ft.# Of Holes:630
Interval Bottom:11933 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4632
Total Gas Produced (MCF)19310
GOR4168
GOR DeterminationBOE
Average BOE per Day21.776
Average MCFE per Day126.319

 Federal Financial Assurance  i 

 Tribal Well  i No