Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07328
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:Cottonwood Creek #4-65 27-28 4AH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:453716LocationID:453244
Municipality/County:AURORA / ARAPAHOE #005Location:SWSE 27 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5754 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:430FSL  1410 FELLat/Long: 39.668572 / -104.645950Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.668572 / -104.645950Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/24/2018
End Date: 7/4/2018
Reported: 1/26/2020
Originally Reported: 8/1/2018
Days to report: 571
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 18257 ft.    Vertical TD: 7987 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/10/2020
Proposed Top PZ Location:Sec:27 Twp: 4S 65W Footage: 1204 FSL  698 FEL
Bottom Hole Location:Sec:28 Twp: 4S 65W Footage: 1201 FSL  345 FWL
Proposed Depth/Form:18365 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-883 , Unit Acreage: 1280, Drill Unit: S. 27-28 All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2222 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 0 ft., Bottom: 2222 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18249 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 2270, Top: 2222 ft., Bottom: 18249 ft.

Wellbore Completed
Completion Date:5/9/2018
Spud Date:4/16/2018Spud Date Is:ACTUAL
Measured TD:18257 ft.Measured PB depth:18131 ft.
True Vertical TD:7987 ft.True Vertical PB depth:7986 ft.
Top PZ Location:Sec:27 Twp: 4S 65WFootage: 1204 FSL  698 FEL
Bottom Hole Location:Sec:28 Twp: 4S 65WFootage: 1201 FSL  345 FWL
Log Types:MWD/LWD; Mud Log; CBL; (Resistivity in API 005-07329)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 125 ft., Weight: 95 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 125 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2221 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 2230 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18226 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 2375, Top: 1511 ft., Bottom: 18257 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1804 ft.
PIERRE2022 ft.
SUSSEX7578 ft.
SHANNON7878 ft.
SHARON SPRINGS8093 ft.
NIOBRARA8221 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 8677 ft.    Interval Bottom: 18072 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/10/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/24/2018Treatment End Date:7/4/2018
Treatment Summary:22,357 bbls of FR Water (FR-76) 14,059 bbls of 25# Hybor G 164,412 bbls of 23# Hybor G 385 bbls of 23# Linear 8,744 bbls of PD Treated Water 1,014 bbls of 7.5% HCl Acid 1,913 bbls of 15% HCl Acid
Total fluid used in treatment (bbls):212884Max pressure during treatment (psi):9007
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.36
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):2927Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):33346
Fresh water used in treatment (bbls):209957Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13169165Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8643 ft.
Tubing Packer Depth:8612 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/18/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1555
BBLS_OIL 1142
BTU_GAS 1536
CALC_BBLS_H2O 1555
CALC_BBLS_OIL 1142
CALC_GOR 1152
CALC_MCF_GAS 1316
GRAVITY_OIL 41
MCF_GAS 1316
TUBING_PRESS 959
Perforation Data:
Interval Top:8677 ft.# Of Holes:1242
Interval Bottom:18072 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7846
Total Gas Produced (MCF)13324
GOR1698
GOR DeterminationBOE
Average BOE per Day27.728
Average MCFE per Day160.806

 Federal Financial Assurance  i 

 Tribal Well  i No