Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07250
Well Classification: OW Status: PR - 1/1/2024
Well Name/No:Prosper Farms 4-65 2-1 #4CH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:443724LocationID:443722
County:ARAPAHOE #005Location:SWSW 2 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5637 ft.
Planned Location:1180FSL  510 FWLLat/Long: 39.728850 / -104.638908Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.728847 / -104.638908Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/1/2017
End Date: 9/14/2017
Reported: 10/10/2017
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2024             Measured TD: 14617 ft.    Vertical TD: 7785 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/25/2017
Proposed Top PZ Location:Sec:2 Twp: 4S 65W Footage: 498 FSL  1970 FWL
Bottom Hole Location:Sec:1 Twp: 4S 65W Footage: 465 FSL  2294 FWL
Proposed Depth/Form:13974 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-685 , Unit Acreage: 1280, Drill Unit: Sec 1 & 2: All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2142 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 2142 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 2142 ft., Depth: 14522 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1770, Top: 2142 ft., Bottom: 14522 ft.

Wellbore Completed
Completion Date:6/14/2017
Spud Date:5/31/2017Spud Date Is:ACTUAL
Measured TD:14617 ft.Measured PB depth:14608 ft.
True Vertical TD:7785 ft.True Vertical PB depth:7785 ft.
Top PZ Location:Sec:2 Twp: 4S 65WFootage: 498 FSL  1970 FWL
Bottom Hole Location:Sec:1 Twp: 4S 65WFootage: 465 S  2294 W
Log Types:MWD, Mud, CBL (Induction in 005-06204)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: , Top: 0 ft., Depth: 99 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 126 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2180 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 2180 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 14575 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1900, Top: 1980 ft., Bottom: 14575 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1713 ft.1943 ft.NN
PIERRE1943 ft.7739 ft.NN
NIOBRARA7739 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2024                  Interval Top: 8147 ft.    Interval Bottom: 14447 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/1/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2017Treatment End Date:9/11/2017
Treatment Summary:Treatment Summary: 6,743,300 gallons of FR Water (FR-76) 273,399 gallons of Treated Water 89,514 gallons of 15% HCI Acid 774,220 pounds of 100 Mesh 5,062,723 pounds of 40/70
Total fluid used in treatment (bbls):169196Max pressure during treatment (psi):8970
Total gas used in treatment (mcf):0Fluid density (lbs/gal):0.82
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):2131Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):6510Total flowback volume recovered (bbls):165886
Fresh water used in treatment (bbls):160555Disposition method For flowback:RECYCLE
Total proppant used (lbs):5851480Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7627 ft.
Tubing Packer Depth:7620 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/8/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 400
BBLS_OIL 646
BTU_GAS 1446
CALC_BBLS_H2O 400
CALC_BBLS_OIL 646
CALC_GOR 994
CALC_MCF_GAS 3747
GRAVITY_OIL 41
MCF_GAS 3747
TUBING_PRESS 950
Perforation Data:
Interval Top:8147 ft.# Of Holes:1132
Interval Bottom:14447 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)9064
Total Gas Produced (MCF)17169
GOR1894
GOR DeterminationBOE
Average BOE per Day32.864
Average MCFE per Day190.612

 Federal Financial Assurance  i 

 Tribal Well  i No