Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 This operator is no longer active in the State of Colorado.
 Surface Location
 API# 05-005-07204
Well Classification: OW Status: PA - 6/14/2018
Well Name/No:Converse Family 6 #1H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CONOCO PHILLIPS COMPANY - 19160
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/14/2018
FacilityID:431992LocationID:431995
County:ARAPAHOE #005Location:NESE 6 4s63W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5604 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FSL  260 FELLat/Long: 39.728869 / -104.472106Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.728864 / -104.472106Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/28/2013
End Date: 9/29/2013
Reported: 10/6/2013
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/14/2018             Measured TD: 7646 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/14/2018
Wellbore Permit
Permit #: Expiration Date:2/27/2015
Proposed Top PZ Location:Sec:6 Twp: 4S 63W Footage: 1980 FSL  828 FEL
Bottom Hole Location:Sec:6 Twp: 4S 63W Footage: 1980 FSL  620 FWL
Proposed Depth/Form:7646 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1810 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1810 ft.
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1810 ft., Depth: 7646 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/1/2013
Spud Date:4/24/2013Spud Date Is:ACTUAL
Measured TD:7646 ft.Measured PB depth:6480 ft.
True Vertical TD:True Vertical PB depth:
Bottom Hole Location:Sec:6 Twp: 4S 63WFootage: 1980 FSL  620 FWL
Log Types:Triple Combo, Mud
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1810 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 1810 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1810 ft., Depth: 7650 ft., Weight: 0 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
Additional Cement:String Type: OPEN HOLE , Top: 6480 ft., Depth: 6713 ft., Bottom: 7617 ft., Sacks: 338, Method:
FormationInterval TopLog BottomCoredDSTs
DENVER220 ft.
ARAPAHOE628 ft.
FOX HILLS1456 ft.
SUSSEX6645 ft.
SHANNON6965 ft.
SHARON SPRINGS7086 ft.7133 ft.NN
NIOBRARA7125 ft.7442 ft.NN
FORT HAYS7442 ft.7470 ft.NN
CARLILE7470 ft.7530 ft.NN
GREENHORN7530 ft.7680 ft.NN
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: PA - 6/14/2018             Measured TD: 11354 ft.    Vertical TD: 7303 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PA - 6/14/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/27/2015
Proposed Top PZ Location:Sec:6 Twp: 4s 63w Footage: 1980 FSL  828 FEL
Bottom Hole Location:Sec:6 Twp: 4s 63w Footage: 1980 FSL  620 FWL
Proposed Depth/Form:11427 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1810 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1810 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 1710 ft., Depth: 7581 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 530, Top: 1710 ft., Bottom: 7581 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 6587 ft., Depth: 11287 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/11/2013
Spud Date:4/24/2013Spud Date Is:ACTUAL
Measured TD:11354 ft.Measured PB depth:11354 ft.
True Vertical TD:7303 ft.True Vertical PB depth:7303 ft.
Top PZ Location:Sec:6 Twp: 4S 63WFootage: 1970 FSL  860 FEL
Bottom Hole Location:Sec:6 Twp: 4S 63WFootage: 1979 FSL  631 FWL
Log Types:MWD with resistivity, CBL, Casing Inspection, Mud
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1810 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 1810 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7647 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 610, Top: 1710 ft., Bottom: 7647 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: , Size: 4.5 in., Top: 6589 ft., Depth: 11320 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7119 ft.7180 ft.NN
NIOBRARA7180 ft.11354 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 6/14/2018                 Interval Top: 7721 ft.    Interval Bottom: 11354 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/26/2013Treatment End Date:9/29/2013
Treatment Summary:Frac 20 stages with 2,995,800 gallons (71329 bbls) fresh water gel + 3,923,200 lbs sand proppant consisting of 3,412559 lbs 20/40, 277,318 lbs 20/40CRC, 233,323 lbs 40/70.
Total fluid used in treatment (bbls):71329Max pressure during treatment (psi):7487
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5466
Fresh water used in treatment (bbls):71329Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3923200Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 989
BBLS_OIL 24
BTU_GAS 1432
CALC_BBLS_H2O 989
CALC_BBLS_OIL 24
CALC_GOR 1958
CALC_MCF_GAS 47
GRAVITY_OIL 38
MCF_GAS 47
TUBING_PRESS 225
Perforation Data:
Interval Top:7721 ft.# Of Holes:511
Interval Bottom:11354 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/14/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No