|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2024 Measured TD: 12169 ft. Vertical TD: 7743 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/2/2014 | | Proposed Top PZ Location: | Sec:30 Twp: 4S 64W | Footage: 1649 FNL 1019 FWL | | Bottom Hole Location: | Sec:30 Twp: 4S 64W | Footage: 1653 FNL 483 FEL | | Proposed Depth/Form: | 12659 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-447 , Unit Acreage: 640, Drill Unit: S.30:All | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2060 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 2060 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12210 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 1170, Top: 1950 ft., Bottom: 12210 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7334 ft., Depth: 12659 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 0, Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/21/2014 | | Spud Date: | 4/5/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12169 ft. | Measured PB depth: | 12158 ft. | | True Vertical TD: | 7743 ft. | True Vertical PB depth: | 7743 ft. | | Top PZ Location: | Sec:30 Twp: 4S 64W | Footage: 1649 FNL 1019 FWL | | Bottom Hole Location: | Sec:30 Twp: 4S 64W | Footage: 1653 FNL 483 FEL | | Log Types: | LWD, Mud, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2077 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 0 ft., Bottom: 2077 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12158 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 1595, Top: 1832 ft., Bottom: 12158 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 5012 ft. | | N | N | | SHANNON | 5360 ft. | | N | N | | SHARON SPRINGS | 7662 ft. | | N | N | | NIOBRARA | 7773 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 1/1/2025 Interval Top: 8108 ft. Interval Bottom: 11974 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/30/2014 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/14/2014 | Treatment End Date: | 7/6/2014 | | Treatment Summary: | Frac 22 stages w/ 7,265,163 lbs total proppant including 617,872 lbs 100 Mesh + 6,176,624 lbs Ottawa 40/70 + 470,667 CRC 40/70 in 7,481,408 gal total base fluids (7,376,880 gal fresh water + recylced water). | | Total fluid used in treatment (bbls): | 177735 | Max pressure during treatment (psi): | 8523 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 22 | | Total acid used in treatment (bbls): | 2095 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 4479 | Total flowback volume recovered (bbls): | 14639 | | Fresh water used in treatment (bbls): | 171161 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 7265163 | Green completions techniques utilized: | No | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7201 ft. | | Tubing Packer Depth: | 7171 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/17/2014 | Test Method: | Flow | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 306 | | BBLS_OIL | 550 | | BTU_GAS | 1432 | | CALC_BBLS_H2O | 306 | | CALC_BBLS_OIL | 550 | | CALC_GOR | 1393 | | CALC_MCF_GAS | 766 | | GRAVITY_OIL | 42 | | MCF_GAS | 766 | | TUBING_PRESS | 520 |
| | Perforation Data: | | Interval Top: | 8108 ft. | # Of Holes: | 624 | | Interval Bottom: | 11974 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3025 |
| Total Gas Produced (MCF) | 2029 |
| GOR | 670 |
| GOR Determination | BOE |
| Average BOE per Day | 11.318 |
| Average MCFE per Day | 65.663 |
| Federal Financial Assurance | i | |
|
|