|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/21/2024 Measured TD: 12115 ft. Vertical TD: 7749 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/21/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/2/2014 | | Proposed Top PZ Location: | Sec:30 Twp: 4S 64W | Footage: 1973 FNL 1130 FWL | | Bottom Hole Location: | Sec:30 Twp: 4S 64W | Footage: 1979 FNL 486 FEL | | Proposed Depth/Form: | 12531 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-447 , Unit Acreage: 640, Drill Unit: S.30:All | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2050 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 2050 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12172 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 1170, Top: 1950 ft., Bottom: 12172 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7202 ft., Depth: 12531 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 0, Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 5/10/2014 | | Spud Date: | 4/22/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12115 ft. | Measured PB depth: | 11959 ft. | | True Vertical TD: | 7749 ft. | True Vertical PB depth: | 7749 ft. | | Top PZ Location: | Sec:30 Twp: 4S 64W | Footage: 1973 FNL 1130 FWL | | Bottom Hole Location: | Sec:30 Twp: 4S 64W | Footage: 1979 FNL 486 FEL | | Log Types: | MWD Curve & Lateral, Mud, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2050 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 0 ft., Bottom: 2050 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12105 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 1590, Top: 1950 ft., Bottom: 12105 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 4951 ft. | 5080 ft. | N | N | | SUSSEX | 5285 ft. | 5475 ft. | N | N | | SHARON SPRINGS | 7725 ft. | 7770 ft. | N | N | | NIOBRARA | 7770 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: AB - 11/21/2024 Interval Top: 8149 ft. Interval Bottom: 11924 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/30/2014 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/14/2014 | Treatment End Date: | 7/7/2014 | | Treatment Summary: | Frac 22 stages w/ 6,930,625 lbs total proppant including 591,343 lbs 100 Mesh + 5,920,603 lbs Ottawa 40/70 + 418,679 lbs CRC 40/70 in 7,499,701 gal (178,564 bbls) total base fluid. Total fluid includes 1516 bbls linear gel | | Total fluid used in treatment (bbls): | 178564 | Max pressure during treatment (psi): | 8841 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 22 | | Total acid used in treatment (bbls): | 2190 | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | 4899 | Total flowback volume recovered (bbls): | 12959 | | Fresh water used in treatment (bbls): | 169959 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 6930625 | Green completions techniques utilized: | No | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7034 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 247 | | BBLS_OIL | 429 | | BTU_GAS | 1432 | | CALC_BBLS_H2O | 247 | | CALC_BBLS_OIL | 429 | | CALC_GOR | 1347 | | CALC_MCF_GAS | 578 | | GRAVITY_OIL | 41 | | MCF_GAS | 578 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 8149 ft. | # Of Holes: | 620 | | Interval Bottom: | 11924 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/21/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 04/01/2024 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|