|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2024 Measured TD: 8711 ft. Vertical TD: 8703 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/6/2012 | Proposed Top PZ Location: | Sec:24 Twp: 5S 65W | Footage: 2001 FNL 1817 FEL | Bottom Hole Location: | Sec:24 Twp: 5S 65W | Footage: 2001 FNL 1817 FEL | Proposed Depth/Form: | 8714 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | STATE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: 80, Drill Unit: S/2NE/4 | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 257-1 , Unit Acreage: 80, Drill Unit: S/2NE/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 257-1 , Unit Acreage: 80, Drill Unit: S/2NE4 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S/2NE4 | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 2280 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 1596, Top: , Bottom: 2280 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8714 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8714 ft. |
| | |
Wellbore Completed | Completion Date: | 12/12/2010 | Spud Date: | 11/22/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8711 ft. | Measured PB depth: | 8602 ft. | True Vertical TD: | 8703 ft. | True Vertical PB depth: | 8594 ft. | Top PZ Location: | Sec:24 Twp: 5S 65W | Footage: 2001 FNL 1817 FEL | Bottom Hole Location: | Sec:24 Twp: 5S 65W | Footage: 2001 FNL 1817 FEL | Log Types: | Mud, SON, Spectral GR, TCOM, CBL, RES, RES micro-imager | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 2289 ft., Weight: 28 , Citings Type: ACTUAL | Cement: | Sacks: 460, Top: 0 ft., Bottom: 2289 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8692 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1320, Top: 1554 ft., Bottom: 8711 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5339 ft. | | | | NIOBRARA | 7852 ft. | | Y | | FORT HAYS | 8090 ft. | | Y | | CARLILE | 8121 ft. | | | | CODELL | 8121 ft. | | | | GREENHORN | 8201 ft. | | Y | | X BENTONITE | 8397 ft. | | | | D SAND | 8481 ft. | | | | J SAND | 8518 ft. | | | |
Formation GRNHN Formation Classification: OW Status: PR - 1/1/2024 Interval Top: 8364 ft. Interval Bottom: 8394 ft. Completed Information for Formation GREENHORN | 1st Production Date: | 8/17/2011 | Choke Size: | | Formation Name: | GREENHORN | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/25/2011 | Treatment Summary: | Frac Greenhorn w/46,830 gal Vistar & 1,682,437 scf N2 (foamed to avg 47.3 Q) containing 140,140# 20/40 sand & 10,160# 20/40 SB Excel at avg 15.9 bpm & 4966 psi.
|
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8386 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/19/2011 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 46 | BBLS_OIL | 22 | BTU_GAS | 1400 | CALC_BBLS_H2O | 46 | CALC_BBLS_OIL | 22 | CALC_GOR | 1500 | CALC_MCF_GAS | 33 | GRAVITY_OIL | 39 | MCF_GAS | 33 |
| Perforation Data: | Interval Top: | 8364 ft. | # Of Holes: | 60 | Interval Bottom: | 8394 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: PR - 1/1/2024 Interval Top: 8090 ft. Interval Bottom: 8118 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 1/14/2013 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/15/2012 | Treatment Summary: | 1 stage: Frac Ft. Hays w/ 211,008 gals SW containing 151,140# 40/40 sand and 4000# 20/40 SB Excel at avg. 55.1 bpm & 4699 psig. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/15/2013 | Test Method: | pump | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 6 | BTU_GAS | 1243 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 6 | CALC_GOR | 1166 | CALC_MCF_GAS | 7 | CASING_PRESS | 50 | GRAVITY_OIL | 40 | MCF_GAS | 7 | TUBING_PRESS | 50 |
| Perforation Data: | Interval Top: | 8090 ft. | # Of Holes: | 56 | Interval Bottom: | 8118 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 278 |
Total Gas Produced (MCF) | 110 |
GOR | 395 |
GOR Determination | BOE |
Average BOE per Day | 0.812 |
Average MCFE per Day | 4.722 |
Federal Financial Assurance | i | |
|
|