|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 7518 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | | | Permit #: | 19760849 | Expiration Date: | 9/14/1977 | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 80, Drill Unit: E2SW |
| | |
| Wellbore Completed | | Completion Date: | 9/5/1984 | | Spud Date: | 9/23/1976 | Spud Date Is: | ACTUAL | | Measured TD: | 7518 ft. | Measured PB depth: | 7331 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | INDUCTION ELEC. LOG BOREHOLE COMPENSATED SONIC LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 294 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 7515 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6566 ft. | | | | | FORT HAYS | 6900 ft. | | | | | CARLILE | 6934 ft. | | | | | GREENHORN | 7007 ft. | | | | | GRANEROS | 7062 ft. | | | | | BENTONITE | 7223 ft. | | | | | D SAND | 7315 ft. | | | | | J SAND | 7366 ft. | | | | | SKULL CREEK | 7509 ft. | | | |
Formation JSND Formation Classification: OW Status: CM - 12/26/1984 Interval Top: 7367 ft. Interval Bottom: 7379 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/14/1977 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/5/1984 | | Treatment Summary: | SEE SCAN DOCUMENT # 420573 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7246 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/23/1976 | Test Method: | FLOWING | | Hours Tested: | 0.75 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 4.8 | | MCF_GAS | 1.5 | | TUBING_PRESS | 685 |
| | Perforation Data: | | Interval Top: | 7367 ft. | # Of Holes: | | | Interval Bottom: | 7379 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 7316 ft. Interval Bottom: 7434 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 10/6/1984 | Choke Size: | | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/5/1984 | | Treatment Summary: | SEE SCAN DOCUMENT # 420562 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7327 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/26/1984 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 17 | | MCF_GAS | 35 |
| | Perforation Data: | | Interval Top: | 7316 ft. | # Of Holes: | | | Interval Bottom: | 7434 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 26 |
| Total Gas Produced (MCF) | 47 |
| GOR | 1807 |
| GOR Determination | BOE |
| Average BOE per Day | 0.089 |
| Average MCFE per Day | 0.554 |
| Federal Financial Assurance | i | |
|
|