|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2025 Measured TD: 7300 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2025 | | Wellbore Permit | | | Permit #: | 19730340 | Expiration Date: | 5/30/1974 | | Proposed Depth/Form: | 7350 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 40, Drill Unit: SWSW |
| | |
| Wellbore Completed | | Completion Date: | 8/25/1973 | | Spud Date: | 7/25/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 7300 ft. | Measured PB depth: | 7217 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES-FM DENSITY CAL. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 306 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7297 ft., Weight: 14,15.5,7, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6300 ft. | | | | | FORT HAYS | 6679 ft. | | | | | GREENHORN | 6780 ft. | | | | | BENTONITE | 7002 ft. | | | | | D SAND | 7091 ft. | | | | | J SAND | 7143 ft. | | | |
Formation DSND Formation Classification: OW Status: PR - 12/1/2025 Interval Top: 7096 ft. Interval Bottom: 7203 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 9/4/1973 | Choke Size: | 2.750 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/25/1973 | | Treatment Summary: | SEE SCAN DOCUMENT # 420449 |
| | Tubing Size: | | Tubing Setting Depth: | 7190 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/16/1973 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 168 | | CALC_BBLS_OIL | 168 | | CALC_GOR | 1880 | | CALC_MCF_GAS | 316 | | GRAVITY_OIL | 38.7 | | MCF_GAS | 316 | | TUBING_PRESS | 110 |
| | Perforation Data: | | Interval Top: | 7096 ft. | # Of Holes: | | | Interval Bottom: | 7203 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 416 |
| Total Gas Produced (MCF) | 245 |
| GOR | 588 |
| GOR Determination | BOE |
| Average BOE per Day | 1.253 |
| Average MCFE per Day | 7.285 |
| Federal Financial Assurance | i | |
|
|