Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-06539
Well Classification: OW Status: PR - 8/1/2025
Well Name/No:STATE OF COLO 'T' NCT-3 #3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:70-8033-S
Facility Status:PRStatus Date8/1/2025
FacilityID:204454LocationID:320682
County:ARAPAHOE #005Location:NENW 25 5S65W 6
Field:LOWRY - #52075Elevation:5923 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  1880 FWLLat/Long: 39.593095 / -104.616500Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.593060 / -104.616190Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2025             Measured TD: 8609 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2025
Wellbore Permit
Permit #:19722479 Expiration Date:6/21/1973
Proposed Depth/Form:8609 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 80, Drill Unit: N2NW

Wellbore Completed
Completion Date:9/22/1992
Spud Date:10/31/1972Spud Date Is:ACTUAL
Measured TD:8609 ft.Measured PB depth:8200 ft.
True Vertical TD:True Vertical PB depth:
Log Types:IES, GR-FDC, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 267 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: , Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8608 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE1921 ft.
HYGIENE3094 ft.
NIOBRARA7772 ft.
FORT HAYS8069 ft.
D SAND8473 ft.
J SAND8501 ft.
J-2 SAND8552 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 8/19/1992                 Interval Top: 8505 ft.    Interval Bottom: 8527 ft.

 Completed Information for Formation J SAND
1st Production Date:11/23/1972Choke Size:1.000 in.
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:9/22/1992
Treatment Summary:NONE
Tubing Size:2.875 in.Tubing Setting Depth:
Tubing Packer Depth:8429 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/25/1972Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:VENTED
Test TypeMeasure
BBLS_OIL 1335
CALC_GOR 570
GRAVITY_OIL 38.2
MCF_GAS 761
TUBING_PRESS 140
Perforation Data:
Interval Top:8505 ft.# Of Holes:44
Interval Bottom:8527 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2025                  Interval Top: 7906 ft.    Interval Bottom: 7966 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/7/1992Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:9/22/1992
Treatment Summary:SEE SCANNED DOCUMENT # 00423618
Tubing Size:2.375 in.Tubing Setting Depth:7876 ft.
Tubing Packer Depth:7876 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/21/1992Test Method:PUMPING
Hours Tested:24Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_OIL 52
CALC_BBLS_OIL 331
CALC_GOR 2038
CALC_MCF_GAS 100
CASING_PRESS 30
GRAVITY_OIL 39
MCF_GAS 106
TUBING_PRESS 230
Perforation Data:
Interval Top:7906 ft.# Of Holes:128
Interval Bottom:7966 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)280
Total Gas Produced (MCF)157
GOR560
GOR DeterminationBOE
Average BOE per Day0.856
Average MCFE per Day4.952

 Federal Financial Assurance  i 

 Tribal Well  i No