Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10539
Well Classification: OW Status: PR - 9/27/2024
Well Name/No:Warbler #13W-27-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/27/2024
FacilityID:483420LocationID:483031
County:ADAMS #001Location:SWSE 13 1S66W 6
Field:WATTENBERG - #90750Elevation:5083 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1265FSL  1436 FELLat/Long: 39.961369 / -104.719692Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.961369 / -104.719692Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2024
End Date: 5/2/2024
Reported: 5/16/2024
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/27/2024             Measured TD: 22017 ft.    Vertical TD: 7735 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/27/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/11/2025
Proposed Top PZ Location:Sec:13 Twp: 1S 66W Footage: 358 FSL  860 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66W Footage: 360 FSL  2180 FEL
Proposed Depth/Form:21991 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3386 , Unit Acreage: 2640, Drill Unit: T1S R66W SEC 13: W2W
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 669, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21991 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2840, Top: , Bottom: 21991 ft.

Wellbore Completed
Completion Date:8/28/2023
Spud Date:6/28/2023Spud Date Is:ACTUAL
Measured TD:22017 ft.Measured PB depth:22015 ft.
True Vertical TD:7735 ft.True Vertical PB depth:7735 ft.
Top PZ Location:Sec:13 Twp: 1S 66WFootage: 277 FSL  880 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66WFootage: 228 FSL  2178 FEL
Log Types:CBL, MWD, (RES in API 001-10533 & 001-10529)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2707 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1236, Top: 0 ft., Bottom: 2707 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22015 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3450, Top: 1265 ft., Bottom: 22015 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4822 ft.NN
SUSSEX5275 ft.NN
SHANNON5912 ft.NN
SHARON SPRINGS7652 ft.NN
NIOBRARA7672 ft.NN
FORT HAYS8297 ft.NN
CODELL8385 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 13479 ft.    Interval Bottom: 20423 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/14/2024Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:13479 - 13495, 19139 - 19807, 20244 - 20423
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13479 ft.# Of Holes:263
Interval Bottom:20423 ft.Hole Size:0.36 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 12624 ft.    Interval Bottom: 12667 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/14/2024Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12624 ft.# Of Holes:24
Interval Bottom:12667 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/4/2025                  Interval Top: 9368 ft.    Interval Bottom: 21586 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/14/2024Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:9368 - 9425, 12680 - 12864, 19028 - 19125, 21540 - 21586
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9368 ft.# Of Holes:233
Interval Bottom:21586 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 8437 ft.    Interval Bottom: 21949 ft.

 Completed Information for Formation CODELL
1st Production Date:9/14/2024Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:8437 - 9351, 9438 - 12606, 12882 - 13466, 13507 - 19010, 19808 - 20231, 20437 - 21539, 21597 - 21949
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8437 ft.# Of Holes:3861
Interval Bottom:21949 ft.Hole Size:0.36 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 9/27/2024                 Interval Top: 8437 ft.    Interval Bottom: 21949 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:9/14/2024Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell-Carlile with 76 stage plug and perf: 13443183 total pounds proppant pumped: 8254333 pounds 40/70 mesh; 5188850 pounds 100 mesh; 393663 total bbls fluid pumped: 357713 bbls gelled fluid; 35890 bbls fresh water and 60 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):393663Max pressure during treatment (psi):9092
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:76
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):35890Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13443183Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8183 ft.
Tubing Packer Depth:8182 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2024Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 692
BBLS_OIL 474
BTU_GAS 1400
CALC_BBLS_H2O 692
CALC_BBLS_OIL 474
CALC_GOR 1027
CALC_MCF_GAS 487
CASING_PRESS 601
GRAVITY_OIL 42
MCF_GAS 487
TUBING_PRESS 1713
Perforation Data:
Interval Top:8437 ft.# Of Holes:4381
Interval Bottom:21949 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)155366
Total Gas Produced (MCF)264186
GOR1700
GOR DeterminationBOE
Average BOE per Day550.928
Average MCFE per Day3195.393

 Federal Financial Assurance  i 

 Tribal Well  i No