Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10504
Well Classification: OW Status: PR - 4/7/2023
Well Name/No:GUS LD #15-038HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/7/2023
FacilityID:476873LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5129 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1724FNL  306 FELLat/Long: 39.952897 / -104.885412Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.952898 / -104.885411Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/12/2023
End Date: 2/22/2023
Reported: 3/21/2023
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/7/2023             Measured TD: 17660 ft.    Vertical TD: 7902 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/7/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/10/2022
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2531 FNL  859 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67W Footage: 294 FNL  863 FEL
Proposed Depth/Form:17300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3725 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3725 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3725 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3725 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1752 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 685, Top: 0 ft., Bottom: 1752 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17300 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1927, Top: 5286 ft., Bottom: 17300 ft.

Wellbore Completed
Completion Date:3/2/2022
Spud Date:11/19/2021Spud Date Is:ACTUAL
Measured TD:17660 ft.Measured PB depth:17655 ft.
True Vertical TD:7902 ft.True Vertical PB depth:7902 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2531 FNL  859 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67WFootage: 294 FNL  863 FEL
Log Types:MWD/LWD, Mud, CBL (Composite in 001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2043 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1048, Top: 0 ft., Bottom: 2043 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17660 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1900, Top: 2086 ft., Bottom: 17660 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5232 ft.5408 ft.NN
SUSSEX5735 ft.5979 ft.NN
SHANNON6655 ft.6907 ft.NN
SHARON SPRINGS9061 ft.NN
NIOBRARA9235 ft.NN
FORT HAYS9901 ft.NN
CODELL9990 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 12783 ft.    Interval Bottom: 14453 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 12,783'-14,453'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12783 ft.# Of Holes:1438
Interval Bottom:14453 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2024                 Interval Top: 12133 ft.    Interval Bottom: 16606 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 12,133’ – 12,783’, 14,453’ – 14,864’, 16,094’ – 16,606’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12133 ft.# Of Holes:1438
Interval Bottom:16606 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 10187 ft.    Interval Bottom: 17482 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 10,187’-12,133’, 14,864’- 16,094’, 16,606’ – 17,482’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10187 ft.# Of Holes:1438
Interval Bottom:17482 ft.Hole Size:0.42 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 4/7/2023                  Interval Top: 10187 ft.    Interval Bottom: 17482 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:3/23/2023Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/12/2023Treatment End Date:2/22/2023
Treatment Summary:40 Stage Plug and Perf Total Fluid: 144,639 Gel Fluid: 77,812 bbls Slickwater Fluid: 66,335 bbls 15% HCl Acid: 492 bbls Total Proppant: 8,628,320 lbs Silica Proppant: 8,628,320 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):144639Max pressure during treatment (psi):4797
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):492Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3668
Fresh water used in treatment (bbls):144147Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8628320Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9735 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 383
BBLS_OIL 433
BTU_GAS 1409
CALC_BBLS_H2O 383
CALC_BBLS_OIL 433
CALC_GOR 1275
CALC_MCF_GAS 552
CASING_PRESS 2017
GRAVITY_OIL 44
MCF_GAS 552
TUBING_PRESS 1604
Perforation Data:
Interval Top:10187 ft.# Of Holes:1438
Interval Bottom:17482 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)40771
Total Gas Produced (MCF)172509
GOR4231
GOR DeterminationBOE
Average BOE per Day193.189
Average MCFE per Day1120.496

 Federal Financial Assurance  i 

 Tribal Well  i No