Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10486
Well Classification: OW Status: PR - 3/29/2023
Well Name/No:Gus LD #34-370HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/29/2023
FacilityID:476854LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5124 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1588FNL  381 FELLat/Long: 39.953268 / -104.885679Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.953270 / -104.885690Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/28/2022
End Date: 1/12/2023
Reported: 1/26/2023
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/29/2023             Measured TD: 21828 ft.    Vertical TD: 7965 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/29/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/10/2025
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2566 FSL  1580 FWL
Bottom Hole Location:Sec:34 Twp: 1S 67W Footage: 476 FSL  2438 FEL
Proposed Depth/Form:21891 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2021 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 853, Top: 0 ft., Bottom: 2021 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21891 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3209, Top: , Bottom: 21891 ft.

Wellbore Completed
Completion Date:7/6/2022
Spud Date:5/30/2022Spud Date Is:ACTUAL
Measured TD:21828 ft.Measured PB depth:21806 ft.
True Vertical TD:7965 ft.True Vertical PB depth:7965 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2566 FSL  1580 FWL
Bottom Hole Location:Sec:34 Twp: 1S 67WFootage: 476 FSL  2438 FEL
Log Types:CBL, MWD (Composite log in 05-001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2081 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 944, Top: 0 ft., Bottom: 2081 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21820 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2425, Top: 1230 ft., Bottom: 21820 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4927 ft.
SUSSEX5321 ft.
SHANNON6711 ft.
SHARON SPRINGS8107 ft.
NIOBRARA8282 ft.
FORT HAYS8963 ft.
CODELL9041 ft.
CARLILE15107 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 15107 ft.    Interval Bottom: 15596 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 15,107' – 15,596’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15107 ft.# Of Holes:1272
Interval Bottom:15596 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 10694 ft.    Interval Bottom: 11157 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 10,694' – 11,157'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10694 ft.# Of Holes:1272
Interval Bottom:11157 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2024                 Interval Top: 10119 ft.    Interval Bottom: 16460 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 10,119' – 10,694', 12,038' – 12,367', 16,265' – 16,460'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10119 ft.# Of Holes:1272
Interval Bottom:16460 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 9244 ft.    Interval Bottom: 21820 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 9,244’- - 10,119', 11,157' – 12,038', 12,367' – 15,107', 15,596' – 16,265', 16460' – 21,820'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9244 ft.# Of Holes:1272
Interval Bottom:21820 ft.Hole Size:0.42 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 3/29/2023                 Interval Top: 9244 ft.    Interval Bottom: 21820 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:3/21/2023Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/28/2022Treatment End Date:1/12/2023
Treatment Summary:36 Stage Plug and Perf Total Fluid: 233,212 bbls Gel Fluid: 163,554 bbls Slickwater Fluid: 68,997 bbls 15% HCl Acid: 661 bbls Total Proppant: 15,387,487 lbs Silica Proppant: 15,387,487 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):233212Max pressure during treatment (psi):4283
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):661Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):18720
Fresh water used in treatment (bbls):232551Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15387487Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8721 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/29/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1011
BBLS_OIL 514
BTU_GAS 1409
CALC_BBLS_H2O 1011
CALC_BBLS_OIL 514
CALC_GOR 1060
CALC_MCF_GAS 545
CASING_PRESS 2368
GRAVITY_OIL 44
MCF_GAS 545
TUBING_PRESS 1736
Perforation Data:
Interval Top:9244 ft.# Of Holes:1272
Interval Bottom:21820 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)51063
Total Gas Produced (MCF)237655
GOR4654
GOR DeterminationBOE
Average BOE per Day252.192
Average MCFE per Day1462.713

 Federal Financial Assurance  i 

 Tribal Well  i No