Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10471
Well Classification: OW Status: PR - 5/12/2025
Well Name/No:Rio #25N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/12/2025
FacilityID:465159LocationID:465146
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:444FNL  66 FWLLat/Long: 39.999122 / -104.940097Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999122 / -104.940097Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/9/2025
End Date: 3/15/2025
Reported: 5/1/2025
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/12/2025             Measured TD: 2002 ft.    Vertical TD: 2001 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/12/2025
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 460 FNL  2375 FWL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 460 FSL  2375 FWL
Proposed Depth/Form:18333 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18333 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3375, Top: , Bottom: 18333 ft.

Wellbore Completed
Completion Date:3/13/2020
Spud Date:3/11/2020Spud Date Is:ACTUAL
Measured TD:2002 ft.Measured PB depth:1957 ft.
True Vertical TD:2001 ft.True Vertical PB depth:1957 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 768 FNL  2378 FWL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 460 FSL  2375 FWL
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2002 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2002 ft., Determination Method: VISU

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 2/1/2026                  Interval Top: 9057 ft.    Interval Bottom: 18089 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/28/2025Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/9/2025Treatment End Date:3/15/2025
Treatment Summary:Niobrara completed with 228 bbls 28% HCL, 186,990 bbls slurry, 8,911,068 lb 40/140 Sand.
Total fluid used in treatment (bbls):187218Max pressure during treatment (psi):8388
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):228Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):186990Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8911068Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7898 ft.
Tubing Packer Depth:7888 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2025Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 176
BBLS_OIL 238
BTU_GAS 1172
CALC_BBLS_H2O 176
CALC_BBLS_OIL 238
CALC_GOR 1328
CALC_MCF_GAS 316
CASING_PRESS 199
GRAVITY_OIL 42
MCF_GAS 316
TUBING_PRESS 1152
Perforation Data:
Interval Top:9057 ft.# Of Holes:792
Interval Bottom:18089 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)24320
Total Gas Produced (MCF)196539
GOR8081
GOR DeterminationBOE
Average BOE per Day158.305
Average MCFE per Day918.183

 Federal Financial Assurance  i 

 Tribal Well  i No