Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10462
Well Classification: OW Status: SI - 7/1/2024
Well Name/No:Rio LC #12-368HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2024
FacilityID:465150LocationID:465146
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Planned Location:308FNL  155 FWLLat/Long: 39.999495 / -104.939782Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999496 / -104.939782Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/25/2019
End Date: 10/17/2019
Reported: 11/1/2019
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2024             Measured TD: 18283 ft.    Vertical TD: 7959 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 460 FNL  1875 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 360 FSL  1900 FEL
Proposed Depth/Form:18158 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12 ALL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18158 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1820, Top: , Bottom: 18158 ft.

Wellbore Completed
Completion Date:8/5/2019
Spud Date:7/4/2019Spud Date Is:ACTUAL
Measured TD:18283 ft.Measured PB depth:18273 ft.
True Vertical TD:7959 ft.True Vertical PB depth:7959 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 553 FNL  1892 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 234 S  1881 E
Log Types:CBL, Mud Log, MWD/LWD, (Composite in API# 001-09950)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1772 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1772 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18283 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2565, Top: 3060 ft., Bottom: 18283 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4438 ft.4543 ft.NN
SUSSEX4961 ft.5121 ft.NN
SHANNON5538 ft.5619 ft.NN
SHARON SPRINGS7890 ft.NN
NIOBRARA7922 ft.NN
FORT HAYS8586 ft.NN
CODELL8820 ft.NN
CARLILE12981 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 12981 ft.    Interval Bottom: 17851 ft.

 Completed Information for Formation CARLILE
1st Production Date:11/19/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Carlile perforation intervals: 12981'-13549', 17685'-17851'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12981 ft.# Of Holes:1410
Interval Bottom:17851 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 12068 ft.    Interval Bottom: 12273 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/19/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Niobrara perforation interval: 12068'-12273'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12068 ft.# Of Holes:1410
Interval Bottom:12273 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 8820 ft.    Interval Bottom: 17972 ft.

 Completed Information for Formation CODELL
1st Production Date:11/19/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Codell perforation intervals: 8820'-8996', 9247'-11698', 11875'-12067', 12750'-12980', 13550'-15975', 16134'-16140', 16552'-17503', 17636'-17684', 17852'-17972'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8820 ft.# Of Holes:1410
Interval Bottom:17972 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/29/2020                 Interval Top: 8730 ft.    Interval Bottom: 17635 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:11/19/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Fort Hays perforation intervals: 8730'-8819', 8997'-9246', 11699'-11874', 12274'-12749, 15976'-16133', 16140'-16551', 17504'-17635'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8730 ft.# Of Holes:1410
Interval Bottom:17635 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  SI - 7/1/2024                  Interval Top: 8730 ft.    Interval Bottom: 17972 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:11/19/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/25/2019Treatment End Date:10/17/2019
Treatment Summary:143 bbls 15% HCL Acid; 510,450# 100 Mesh Sand; 8,931,890# 20/40 Sand; 166,925 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):167068Max pressure during treatment (psi):5104
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:47
Total acid used in treatment (bbls):143Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):16909
Fresh water used in treatment (bbls):166925Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9442340Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7949 ft.
Tubing Packer Depth:7931 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/23/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 538
BBLS_OIL 576
BTU_GAS 1387
CALC_BBLS_H2O 538
CALC_BBLS_OIL 576
CALC_GOR 2313
CALC_MCF_GAS 1332
CASING_PRESS 1948
GRAVITY_OIL 45
MCF_GAS 1332
TUBING_PRESS 1465
Perforation Data:
Interval Top:8730 ft.# Of Holes:1410
Interval Bottom:17972 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)5301
Total Gas Produced (MCF)81642
GOR15401
GOR DeterminationMCFE
Average BOE per Day52.843
Average MCFE per Day306.480

 Federal Financial Assurance  i 

 Tribal Well  i No