Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10458
Well Classification: OW Status: PR - 5/12/2025
Well Name/No:Rio #19NA
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/12/2025
FacilityID:465145LocationID:465146
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:354FNL  65 FWLLat/Long: 39.999369 / -104.940101Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999369 / -104.940101Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/17/2025
End Date: 3/21/2025
Reported: 5/1/2025
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/12/2025             Measured TD: 2019 ft.    Vertical TD: 2019 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/12/2025
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 460 FNL  755 FWL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 460 FSL  755 FWL
Proposed Depth/Form:19206 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec 1 & 12: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1717 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 714, Top: 0 ft., Bottom: 1717 ft.
Casing:String Type: 1ST, Hole Size: 8.2 in., Size: 5.5 in., Top: 0 ft., Depth: 19206 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3521, Top: , Bottom: 19206 ft.

Wellbore Completed
Completion Date:3/22/2020
Spud Date:3/21/2020Spud Date Is:ACTUAL
Measured TD:2019 ft.Measured PB depth:1974 ft.
True Vertical TD:2019 ft.True Vertical PB depth:1974 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 772 FNL  713 FWL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 460 FSL  755 FWL
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2019 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 930, Top: 0 ft., Bottom: 2019 ft., Determination Method: VISU

Formation NBRR                     Formation Classification:  OW                     Status:  WO - 1/1/2026                  Interval Top: 9902 ft.    Interval Bottom: 18923 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/5/2025Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/17/2025Treatment End Date:3/21/2025
Treatment Summary:Niobrara completed with 312 bbls 28% HCL, 187,413 bbls slurry, 9,036,876 lb 40/140 Sand.
Total fluid used in treatment (bbls):187725Max pressure during treatment (psi):8451
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):312Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):187413Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9036876Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8786 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2025Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 418
BBLS_OIL 206
BTU_GAS 1172
CALC_BBLS_H2O 418
CALC_BBLS_OIL 206
CALC_GOR 1612
CALC_MCF_GAS 332
CASING_PRESS 723
GRAVITY_OIL 42
MCF_GAS 332
TUBING_PRESS 1637
Perforation Data:
Interval Top:9902 ft.# Of Holes:800
Interval Bottom:18923 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)52830
Total Gas Produced (MCF)317405
GOR6008
GOR DeterminationBOE
Average BOE per Day292.893
Average MCFE per Day1698.782

 Federal Financial Assurance  i 

 Tribal Well  i No