|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/5/2025 Measured TD: 2018 ft. Vertical TD: 2018 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/5/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/6/2021 | | Proposed Top PZ Location: | Sec:1 Twp: 1S 68W | Footage: 460 FNL 485 FWL | | Bottom Hole Location: | Sec:12 Twp: 1S 68W | Footage: 460 FSL 485 FWL | | Proposed Depth/Form: | 19640 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec 1 & 12: All | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1725 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 718, Top: 0 ft., Bottom: 1725 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19640 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 3593, Top: , Bottom: 19640 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/23/2020 | | Spud Date: | 3/22/2020 | Spud Date Is: | ACTUAL | | Measured TD: | 2018 ft. | Measured PB depth: | 1973 ft. | | True Vertical TD: | 2018 ft. | True Vertical PB depth: | 1973 ft. | | Top PZ Location: | Sec:1 Twp: 1S 68W | Footage: 727 FNL 505 FWL | | Bottom Hole Location: | Sec:12 Twp: 1S 68W | Footage: 460 FSL 485 FWL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2018 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 930, Top: 0 ft., Bottom: 2018 ft., Determination Method: VISU |
Formation FTHYS Formation Classification: OW Status: CM - 2/10/2026 Interval Top: 13145 ft. Interval Bottom: 19070 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 5/5/2025 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/10/2026 | Treatment End Date: | N/A | | Treatment Summary: | Ft. Hays perforated intervals: 13145-13322, 14499-15052, 15731-16244, 18453-19070
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 13145 ft. | # Of Holes: | 0 | | Interval Bottom: | 19070 ft. | Hole Size: | |
|
Formation CD-FH Formation Classification: OW Status: PR - 1/1/2026 Interval Top: 10185 ft. Interval Bottom: 19245 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 5/5/2025 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 3/17/2025 | Treatment End Date: | 3/21/2025 | | Treatment Summary: | Codell-Fort Hays completed with 312 bbls 28% HCL, 193,665 bbls slurry, 9,089,200 lb 40/140 Sand.
| | Total fluid used in treatment (bbls): | 193977 | Max pressure during treatment (psi): | 8482 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 25 | | Total acid used in treatment (bbls): | 312 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 193665 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 9089200 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9441 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/5/2025 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 920 | | BBLS_OIL | 580 | | BTU_GAS | 1172 | | CALC_BBLS_H2O | 920 | | CALC_BBLS_OIL | 580 | | CALC_GOR | 1145 | | CALC_MCF_GAS | 664 | | CASING_PRESS | 82 | | GRAVITY_OIL | 42 | | MCF_GAS | 664 | | TUBING_PRESS | 1904 |
| | Perforation Data: | | Interval Top: | 10185 ft. | # Of Holes: | 800 | | Interval Bottom: | 19245 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 2/10/2026 Interval Top: 10185 ft. Interval Bottom: 19245 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/5/2025 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/10/2026 | Treatment End Date: | N/A | | Treatment Summary: | Codell perforated intervals: 10185-13144, 13323-14498, 15053-15730, 16245-18452, 19071-19245
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 10185 ft. | # Of Holes: | 0 | | Interval Bottom: | 19245 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 73158 |
| Total Gas Produced (MCF) | 280712 |
| GOR | 3837 |
| GOR Determination | BOE |
| Average BOE per Day | 330.947 |
| Average MCFE per Day | 1919.520 |
| Federal Financial Assurance | i | |
|
|