|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2019 Measured TD: 16550 ft. Vertical TD: 7676 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/27/2020 | | Proposed Top PZ Location: | Sec:1 Twp: 1S 67W | Footage: 1987 FSL 460 FWL | | Bottom Hole Location: | Sec:6 Twp: 1S 66W | Footage: 1975 FSL 2283 FWL | | Proposed Depth/Form: | 16058 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-2176 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2 | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 707, Top: 0 ft., Bottom: 1700 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16058 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1987, Top: , Bottom: 16058 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/6/2019 | | Spud Date: | 6/22/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 16550 ft. | Measured PB depth: | 16031 ft. | | True Vertical TD: | 7676 ft. | True Vertical PB depth: | 7681 ft. | | Top PZ Location: | Sec:1 Twp: 1S 67W | Footage: 1973 FSL 553 FWL | | Bottom Hole Location: | Sec:6 Twp: 1S 66W | Footage: 1972 FSL 2514 FEL | | Log Types: | Mud log, MWD/LWD, CBL, Composite | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1794 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 1794 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16042 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2269, Top: 1472 ft., Bottom: 16042 ft., Determination Method: CBL | | Casing: | String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 16042 ft., Depth: 16550 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4511 ft. | 4721 ft. | N | N | | SUSSEX | 4957 ft. | 5161 ft. | N | N | | SHANNON | 5544 ft. | 5776 ft. | N | N | | SHARON SPRINGS | 7849 ft. | | N | N | | NIOBRARA | 7871 ft. | | N | N | | FORT HAYS | 8508 ft. | | N | N | | CODELL | 8627 ft. | | N | N | | CARLILE | 11691 ft. | | N | N |
Formation CARL Formation Classification: OW Status: CM - 7/28/2020 Interval Top: 11691 ft. Interval Bottom: 13338 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 9/17/2019 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/28/2020 | Treatment End Date: | N/A | | Treatment Summary: | Carlile Perf Interval: 11,691'- 12,285', 13,073' - 13,338'
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 11691 ft. | # Of Holes: | 1020 | | Interval Bottom: | 13338 ft. | Hole Size: | 0.38 in. |
|
Formation CD-CRL Formation Classification: OW Status: PR - 9/10/2019 Interval Top: 8994 ft. Interval Bottom: 15741 ft.| Completed Information for Formation CODELL-CARLILE | | 1st Production Date: | 9/17/2019 | Choke Size: | | | Formation Name: | CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/1/2019 | Treatment End Date: | 8/11/2019 | | Treatment Summary: | 341,600# 100 Mesh Sand; 6,462,468# 20/40 Sand; 114,879 bbls gelled fluid; Flowback determined from well test separator. | | Total fluid used in treatment (bbls): | 114879 | Max pressure during treatment (psi): | 4185 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 34 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 12827 | | Fresh water used in treatment (bbls): | 114879 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 6804068 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7558 ft. | | Tubing Packer Depth: | 7571 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/10/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 330 | | BBLS_OIL | 652 | | BTU_GAS | 1439 | | CALC_BBLS_H2O | 330 | | CALC_BBLS_OIL | 652 | | CALC_GOR | 1396 | | CALC_MCF_GAS | 910 | | CASING_PRESS | 153 | | GRAVITY_OIL | 45 | | MCF_GAS | 910 | | TUBING_PRESS | 1473 |
| | Perforation Data: | | Interval Top: | 8994 ft. | # Of Holes: | 1020 | | Interval Bottom: | 15741 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 7/28/2020 Interval Top: 8994 ft. Interval Bottom: 15741 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/17/2019 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/28/2020 | Treatment End Date: | N/A | | Treatment Summary: | Codell Perf Interval: 8,994' - 11,690', 12,286' - 13,072', 13,339' - 15,741'
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8994 ft. | # Of Holes: | 1020 | | Interval Bottom: | 15741 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3196 |
| Total Gas Produced (MCF) | 49484 |
| GOR | 15483 |
| GOR Determination | MCFE |
| Average BOE per Day | 32.137 |
| Average MCFE per Day | 186.353 |
| Federal Financial Assurance | i | |
|
|