Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10221
Well Classification: OW Status: PR - 1/1/2022
Well Name/No:BEF WEST #20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PETRO OPERATING COMPANY LLC - 10583
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2022
FacilityID:458143LocationID:458074
Municipality/County:BRIGHTON / ADAMS #001Location:SENE 2 1S66W 6
Field:WATTENBERG - #90750Elevation:5048 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2072FNL  321 FELLat/Long: 39.994850 / -104.734700Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.994860 / -104.734700Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/25/2019
End Date: 5/2/2019
Reported: 6/10/2019
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2022             Measured TD: 12326 ft.    Vertical TD: 7455 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2022
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:10/17/2020
Proposed Top PZ Location:Sec:2 Twp: 1S 66W Footage: 826 FNL  487 FEL
Bottom Hole Location:Sec:2 Twp: 1S 66W Footage: 828 FNL  461 FWL
Proposed Depth/Form:12144 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2163 , Unit Acreage: 640, Drill Unit: SEC 2 ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 576, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12144 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1581, Top: , Bottom: 12144 ft.

Wellbore Completed
Completion Date:2/16/2019
Spud Date:12/21/2018Spud Date Is:ACTUAL
Measured TD:12326 ft.Measured PB depth:12263 ft.
True Vertical TD:7455 ft.True Vertical PB depth:7458 ft.
Top PZ Location:Sec:2 Twp: 1S 66WFootage: 826 FNL  487 FEL
Bottom Hole Location:Sec:2 Twp: 1S 66WFootage: 828 FNL  461 FWL
Log Types:MWD/LWD, Mud, CBL, GR in 05-001-10215
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1547 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1547 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12310 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1480, Top: 2886 ft., Bottom: 12326 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4016 ft.NN
SUSSEX4883 ft.NN
SHANNON5656 ft.NN
SHARON SPRINGS7135 ft.NN
NIOBRARA7486 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2022                  Interval Top: 7988 ft.    Interval Bottom: 12199 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/6/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/25/2019Treatment End Date:5/2/2019
Treatment Summary:Frac Summary: 23 Stages, 11,340 Gals 28% HCL; 6,127,570 # 40/70 White Sand; 1,532,270 # 100 Mesh; 6,959,015 Gals Slickwater. Total Proppant used 7,659,840 #, Ave Rate 18.0 bpm, Ave PSI 4544, Max PSI 5250.
Total fluid used in treatment (bbls):205979Max pressure during treatment (psi):5250
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):270Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13701
Fresh water used in treatment (bbls):205709Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7659840Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7667 ft.
Tubing Packer Depth:7292 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/4/2019Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 626
BBLS_OIL 405
BTU_GAS 1245
CALC_BBLS_H2O 626
CALC_BBLS_OIL 405
CALC_GOR 901
CALC_MCF_GAS 365
CASING_PRESS 3500
GRAVITY_OIL 41
MCF_GAS 365
TUBING_PRESS 1500
Perforation Data:
Interval Top:7988 ft.# Of Holes:828
Interval Bottom:12199 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4060
Total Gas Produced (MCF)73442
GOR18089
GOR DeterminationMCFE
Average BOE per Day45.658
Average MCFE per Day264.820

 Federal Financial Assurance  i 

 Tribal Well  i No