Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10209
Well Classification: OW Status: PR - 12/1/2021
Well Name/No:BEF WEST #19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PETRO OPERATING COMPANY LLC - 10583
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2021
FacilityID:458080LocationID:458074
Municipality/County:BRIGHTON / ADAMS #001Location:SENE 2 1S66W 6
Field:WATTENBERG - #90750Elevation:5048 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2088FNL  321 FELLat/Long: 39.994810 / -104.734700Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.994820 / -104.734700Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/3/2019
End Date: 5/10/2019
Reported: 6/10/2019
Days to report: 31
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2021             Measured TD: 12244 ft.    Vertical TD: 7374 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/16/2020
Proposed Top PZ Location:Sec:2 Twp: 1S 66W Footage: 1077 FNL  518 FEL
Bottom Hole Location:Sec:2 Twp: 1S 66W Footage: 1069 FNL  460 FWL
Proposed Depth/Form:12075 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2163 , Unit Acreage: 640, Drill Unit: SEC 2 ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 940, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12075 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1849, Top: 1500 ft., Bottom: 12075 ft.

Wellbore Completed
Completion Date:2/8/2019
Spud Date:12/23/2018Spud Date Is:ACTUAL
Measured TD:12244 ft.Measured PB depth:12183 ft.
True Vertical TD:7374 ft.True Vertical PB depth:7374 ft.
Top PZ Location:Sec:2 Twp: 1S 66WFootage: 1077 FNL  518 FEL
Bottom Hole Location:Sec:2 Twp: 1S 66WFootage: 1069 FNL  460 FWL
Log Types:MWD/LWD, Mud, CBL, GR in 05-001-10215
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1545 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1545 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12229 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1515, Top: 2282 ft., Bottom: 12244 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4005 ft.NN
SUSSEX4854 ft.NN
SHANNON5609 ft.NN
SHARON SPRINGS7092 ft.NN
NIOBRARA7437 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2021                 Interval Top: 7940 ft.    Interval Bottom: 12118 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/6/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/3/2019Treatment End Date:5/10/2019
Treatment Summary:Frac Summary: 23 Stages, 11,592 Gals 28% HCL; 6,108,810 # 40/70 White Sand; 1,531,750 # 100 Mesh; 5,406,093 Gals Slickwater. Total Proppant used 7,640,560 #, During Pumpdown Ave Rate 17.8 bpm, Ave PSI 5432, Max PSI 8086.
Total fluid used in treatment (bbls):213415Max pressure during treatment (psi):8086
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):276Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9005
Fresh water used in treatment (bbls):213139Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7640560Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7485 ft.
Tubing Packer Depth:7125 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/6/2019Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 548
BBLS_OIL 445
BTU_GAS 1245
CALC_BBLS_H2O 548
CALC_BBLS_OIL 445
CALC_GOR 874
CALC_MCF_GAS 389
CASING_PRESS 3375
GRAVITY_OIL 41
MCF_GAS 389
TUBING_PRESS 1625
Perforation Data:
Interval Top:7940 ft.# Of Holes:828
Interval Bottom:12118 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4807
Total Gas Produced (MCF)74125
GOR15420
GOR DeterminationMCFE
Average BOE per Day48.049
Average MCFE per Day278.683

 Federal Financial Assurance  i 

 Tribal Well  i No