Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10207
Well Classification: OW Status: PR - 1/1/2023
Well Name/No:BEF WEST #21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PETRO OPERATING COMPANY LLC - 10583
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2023
FacilityID:458078LocationID:458074
Municipality/County:BRIGHTON / ADAMS #001Location:SENE 2 1S66W 6
Field:WATTENBERG - #90750Elevation:5048 ft.
Planned Location:2056FNL  321 FELLat/Long: 39.994890 / -104.734700Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.994900 / -104.734700Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/25/2019
End Date: 5/2/2019
Reported: 6/10/2019
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2023             Measured TD: 12661 ft.    Vertical TD: 7587 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2023
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:10/16/2020
Proposed Top PZ Location:Sec:2 Twp: 1S 66W Footage: 552 FNL  460 FEL
Bottom Hole Location:Sec:2 Twp: 1S 66W Footage: 560 FNL  461 FWL
Proposed Depth/Form:12407 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2163 , Unit Acreage: 640, Drill Unit: SEC 2 ALL
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2163 , Unit Acreage: 640, Drill Unit: SEC 2 ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 576, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12407 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1623, Top: , Bottom: 12407 ft.

Wellbore Completed
Completion Date:2/22/2019
Spud Date:12/20/2018Spud Date Is:ACTUAL
Measured TD:12661 ft.Measured PB depth:12603 ft.
True Vertical TD:7587 ft.True Vertical PB depth:7590 ft.
Top PZ Location:Sec:2 Twp: 1S 66WFootage: 552 FNL  488 FEL
Bottom Hole Location:Sec:2 Twp: 1S 66WFootage: 560 N  461 W
Log Types:MWD/LWD, Mud, CBL, GR in 05-001-10215
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1548 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1548 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12649 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1510, Top: 3530 ft., Bottom: 12661 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4096 ft.NN
SUSSEX4921 ft.NN
SHANNON5701 ft.NN
SHARON SPRINGS7245 ft.NN
NIOBRARA7479 ft.NN
FORT HAYS8028 ft.NN
CODELL8116 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/14/2020                 Interval Top: 12194 ft.    Interval Bottom: 12360 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/20/2019Treatment End Date:5/2/2019
Treatment Summary:Frac Summary: 23 Stages, No HCL used; 5,310,300 # 40/70 White Sand; 1,361,820 # 100 Mesh; 5,538,330 Gals Slickwater. Total Proppant used 6,672,120 #, Ave Rate 18.0 bpm, Ave PSI 4,705, Max PSI 5,200.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12194 ft.# Of Holes:36
Interval Bottom:12360 ft.Hole Size:0.35 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 1/1/2023                  Interval Top: 8322 ft.    Interval Bottom: 12543 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:11/6/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/25/2019Treatment End Date:5/2/2019
Treatment Summary:Frac Summary: 23 Stages, No HCL used; 5,310,300 # 40/70 White Sand; 1,361,820 # 100 Mesh; 5,538,330 Gals Slickwater. Total Proppant used 6,672,120 #, Ave Rate 18.0 bpm, Ave PSI 4,705, Max PSI 5,200.
Total fluid used in treatment (bbls):169208Max pressure during treatment (psi):5200
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5188
Fresh water used in treatment (bbls):169208Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6672120Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7938 ft.
Tubing Packer Depth:7446 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/4/2019Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 167
BBLS_OIL 411
BTU_GAS 1245
CALC_BBLS_H2O 167
CALC_BBLS_OIL 411
CALC_GOR 976
CALC_MCF_GAS 401
CASING_PRESS 3400
GRAVITY_OIL 41
MCF_GAS 401
TUBING_PRESS 1550
Perforation Data:
Interval Top:8322 ft.# Of Holes:828
Interval Bottom:12543 ft.Hole Size:0.35 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/14/2020                 Interval Top: 8322 ft.    Interval Bottom: 12543 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/25/2019Treatment End Date:5/2/2019
Treatment Summary:Frac Summary: 23 Stages, No HCL used; 5,310,300 # 40/70 White Sand; 1,361,820 # 100 Mesh; 5,538,330 Gals Slickwater. Total Proppant used 6,672,120 #, Ave Rate 18.0 bpm, Ave PSI 4,705, Max PSI 5,200.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8322 ft.# Of Holes:792
Interval Bottom:12543 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)9309
Total Gas Produced (MCF)82591
GOR8872
GOR DeterminationBOE
Average BOE per Day64.449
Average MCFE per Day373.790

 Federal Financial Assurance  i 

 Tribal Well  i No