Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10099
Well Classification: OW Status: PR - 1/1/2023
Well Name/No:B-Farm LD #18-388HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2023
FacilityID:453086LocationID:452914
County:ADAMS #001Location:NENW 7 1S67W 6
Field:WATTENBERG - #90750Elevation:5128 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1004FNL  1743 FWLLat/Long: 39.983600 / -104.934031Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.983601 / -104.934027Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/10/2018
End Date: 3/19/2018
Reported: 4/3/2018
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2023             Measured TD: 18510 ft.    Vertical TD: 8002 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/21/2019
Proposed Top PZ Location:Sec:7 Twp: 1S 67W Footage: 622 FNL  2237 FWL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 94 FSL  2093 FWL
Proposed Depth/Form:18396 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1080, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18396 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2346, Top: 0 ft., Bottom: 18396 ft.

Wellbore Completed
Completion Date:1/8/2018
Spud Date:12/27/2017Spud Date Is:ACTUAL
Measured TD:18510 ft.Measured PB depth:18502 ft.
True Vertical TD:8002 ft.True Vertical PB depth:8002 ft.
Top PZ Location:Sec:7 Twp: 1S 67WFootage: 622 FNL  2237 FWL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 94 FSL  2093 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Composite 001-10098)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1720 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 773, Top: 0 ft., Bottom: 1720 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18510 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3149, Top: 0 ft., Bottom: 18510 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3531 ft.3735 ft.NN
SUSSEX4905 ft.5160 ft.NN
SHANNON6051 ft.6289 ft.NN
SHARON SPRINGS7566 ft.NN
NIOBRARA7717 ft.NN
FORT HAYS8257 ft.NN
CODELL8291 ft.NN
CARLILE8313 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 9740 ft.    Interval Bottom: 18408 ft.

 Completed Information for Formation CODELL
1st Production Date:4/3/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Codell perf interval: 9740' - 18408'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9740 ft.# Of Holes:1470
Interval Bottom:18408 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 8667 ft.    Interval Bottom: 9739 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/3/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Carlile perf interval: 8667' - 9739'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8667 ft.# Of Holes:1470
Interval Bottom:9739 ft.Hole Size:0.38 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 1/1/2023                  Interval Top: 8667 ft.    Interval Bottom: 18408 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:4/3/2018Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2018Treatment End Date:3/19/2018
Treatment Summary:525,361 lbs 100 Mesh Sand; 9,321,548 lbs 20/40 Sand; 176,567 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):176567Max pressure during treatment (psi):4253
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10757
Fresh water used in treatment (bbls):176567Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9846909Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8202 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/6/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 255
BBLS_OIL 566
BTU_GAS 1362
CALC_BBLS_H2O 255
CALC_BBLS_OIL 566
CALC_GOR 1973
CALC_MCF_GAS 1117
CASING_PRESS 2300
GRAVITY_OIL 45
MCF_GAS 1117
TUBING_PRESS 1900
Perforation Data:
Interval Top:8667 ft.# Of Holes:1470
Interval Bottom:18408 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)6314
Total Gas Produced (MCF)61432
GOR9729
GOR DeterminationBOE
Average BOE per Day47.735
Average MCFE per Day276.856

 Federal Financial Assurance  i 

 Tribal Well  i No