|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2023 Measured TD: 18510 ft. Vertical TD: 8002 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/21/2019 | Proposed Top PZ Location: | Sec:7 Twp: 1S 67W | Footage: 622 FNL 2237 FWL | Bottom Hole Location: | Sec:18 Twp: 1S 67W | Footage: 94 FSL 2093 FWL | Proposed Depth/Form: | 18396 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1080, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 707, Top: 0 ft., Bottom: 1700 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18396 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2346, Top: 0 ft., Bottom: 18396 ft. |
| | |
Wellbore Completed | Completion Date: | 1/8/2018 | Spud Date: | 12/27/2017 | Spud Date Is: | ACTUAL | Measured TD: | 18510 ft. | Measured PB depth: | 18502 ft. | True Vertical TD: | 8002 ft. | True Vertical PB depth: | 8002 ft. | Top PZ Location: | Sec:7 Twp: 1S 67W | Footage: 622 FNL 2237 FWL | Bottom Hole Location: | Sec:18 Twp: 1S 67W | Footage: 94 S 2093 W | Log Types: | CBL, Mud Log, MWD/LWD, (Composite 001-10098) | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1720 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 773, Top: 0 ft., Bottom: 1720 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18510 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 3149, Top: 0 ft., Bottom: 18510 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3531 ft. | 3735 ft. | N | N | SUSSEX | 4905 ft. | 5160 ft. | N | N | SHANNON | 6051 ft. | 6289 ft. | N | N | SHARON SPRINGS | 7566 ft. | | N | N | NIOBRARA | 7717 ft. | | N | N | FORT HAYS | 8257 ft. | | N | N | CODELL | 8291 ft. | | N | N | CARLILE | 8313 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 2/10/2020 Interval Top: 9740 ft. Interval Bottom: 18408 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/3/2018 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 2/10/2020 | Treatment End Date: | N/A | Treatment Summary: | Codell perf interval: 9740' - 18408' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 9740 ft. | # Of Holes: | 1470 | Interval Bottom: | 18408 ft. | Hole Size: | 0.38 in. |
|
Formation CARL Formation Classification: OW Status: CM - 2/10/2020 Interval Top: 8667 ft. Interval Bottom: 9739 ft. Completed Information for Formation CARLILE | 1st Production Date: | 4/3/2018 | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 2/10/2020 | Treatment End Date: | N/A | Treatment Summary: | Carlile perf interval: 8667' - 9739' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 8667 ft. | # Of Holes: | 1470 | Interval Bottom: | 9739 ft. | Hole Size: | 0.38 in. |
|
Formation CD-CRL Formation Classification: OW Status: PR - 1/1/2023 Interval Top: 8667 ft. Interval Bottom: 18408 ft. Completed Information for Formation CODELL-CARLILE | 1st Production Date: | 4/3/2018 | Choke Size: | | Formation Name: | CODELL-CARLILE | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/10/2018 | Treatment End Date: | 3/19/2018 | Treatment Summary: | 525,361 lbs 100 Mesh Sand; 9,321,548 lbs 20/40 Sand; 176,567 bbls Gelled Fluid. Flowback determined from well test separator | Total fluid used in treatment (bbls): | 176567 | Max pressure during treatment (psi): | 4253 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 49 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.81 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 10757 | Fresh water used in treatment (bbls): | 176567 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 9846909 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8202 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/6/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 255 | BBLS_OIL | 566 | BTU_GAS | 1362 | CALC_BBLS_H2O | 255 | CALC_BBLS_OIL | 566 | CALC_GOR | 1973 | CALC_MCF_GAS | 1117 | CASING_PRESS | 2300 | GRAVITY_OIL | 45 | MCF_GAS | 1117 | TUBING_PRESS | 1900 |
| Perforation Data: | Interval Top: | 8667 ft. | # Of Holes: | 1470 | Interval Bottom: | 18408 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 6028 |
Total Gas Produced (MCF) | 31603 |
GOR | 5242 |
GOR Determination | BOE |
Average BOE per Day | 31.380 |
Average MCFE per Day | 181.999 |
Federal Financial Assurance | i | |
|
|