Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10099
Well Classification: OW Status: PR - 1/1/2023
Well Name/No:B-Farm LD #18-388HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2023
FacilityID:453086LocationID:452914
County:ADAMS #001Location:NENW 7 1S67W 6
Field:WATTENBERG - #90750Elevation:5128 ft.
Planned Location:1004FNL  1743 FWLLat/Long: 39.983600 / -104.934031Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.983601 / -104.934027Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/10/2018
End Date: 3/19/2018
Reported: 4/3/2018
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2023             Measured TD: 18510 ft.    Vertical TD: 8002 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/21/2019
Proposed Top PZ Location:Sec:7 Twp: 1S 67W Footage: 622 FNL  2237 FWL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 94 FSL  2093 FWL
Proposed Depth/Form:18396 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1080, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18396 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2346, Top: 0 ft., Bottom: 18396 ft.

Wellbore Completed
Completion Date:1/8/2018
Spud Date:12/27/2017Spud Date Is:ACTUAL
Measured TD:18510 ft.Measured PB depth:18502 ft.
True Vertical TD:8002 ft.True Vertical PB depth:8002 ft.
Top PZ Location:Sec:7 Twp: 1S 67WFootage: 622 FNL  2237 FWL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 94 S  2093 W
Log Types:CBL, Mud Log, MWD/LWD, (Composite 001-10098)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1720 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 773, Top: 0 ft., Bottom: 1720 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18510 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3149, Top: 0 ft., Bottom: 18510 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3531 ft.3735 ft.NN
SUSSEX4905 ft.5160 ft.NN
SHANNON6051 ft.6289 ft.NN
SHARON SPRINGS7566 ft.NN
NIOBRARA7717 ft.NN
FORT HAYS8257 ft.NN
CODELL8291 ft.NN
CARLILE8313 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 9740 ft.    Interval Bottom: 18408 ft.

 Completed Information for Formation CODELL
1st Production Date:4/3/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Codell perf interval: 9740' - 18408'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9740 ft.# Of Holes:1470
Interval Bottom:18408 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 8667 ft.    Interval Bottom: 9739 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/3/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Carlile perf interval: 8667' - 9739'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8667 ft.# Of Holes:1470
Interval Bottom:9739 ft.Hole Size:0.38 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 1/1/2023                  Interval Top: 8667 ft.    Interval Bottom: 18408 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:4/3/2018Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2018Treatment End Date:3/19/2018
Treatment Summary:525,361 lbs 100 Mesh Sand; 9,321,548 lbs 20/40 Sand; 176,567 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):176567Max pressure during treatment (psi):4253
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10757
Fresh water used in treatment (bbls):176567Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9846909Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8202 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/6/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 255
BBLS_OIL 566
BTU_GAS 1362
CALC_BBLS_H2O 255
CALC_BBLS_OIL 566
CALC_GOR 1973
CALC_MCF_GAS 1117
CASING_PRESS 2300
GRAVITY_OIL 45
MCF_GAS 1117
TUBING_PRESS 1900
Perforation Data:
Interval Top:8667 ft.# Of Holes:1470
Interval Bottom:18408 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)6028
Total Gas Produced (MCF)31603
GOR5242
GOR DeterminationBOE
Average BOE per Day31.380
Average MCFE per Day181.999

 Federal Financial Assurance  i 

 Tribal Well  i No