Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10098
Well Classification: OW Status: PR - 12/1/2022
Well Name/No:B-Farm LD #18-034HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2022
FacilityID:452920LocationID:452914
County:ADAMS #001Location:NENW 7 1S67W 6
Field:WATTENBERG - #90750Elevation:5126 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:924FNL  1843 FWLLat/Long: 39.983819 / -104.933672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.983821 / -104.933671Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/10/2018
End Date: 3/19/2018
Reported: 4/3/2018
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2022             Measured TD: 13833 ft.    Vertical TD: 7968 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/5/2019
Proposed Top PZ Location:Sec:7 Twp: 1S 67W Footage: 590 FNL  1541 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 355 FNL  1541 FEL
Proposed Depth/Form:13799 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13799 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1674, Top: 0 ft., Bottom: 13799 ft.

Wellbore Completed
Completion Date:1/15/2018
Spud Date:12/31/2017Spud Date Is:ACTUAL
Measured TD:13833 ft.Measured PB depth:13825 ft.
True Vertical TD:7968 ft.True Vertical PB depth:7968 ft.
Top PZ Location:Sec:7 Twp: 1S 67WFootage: 590 FNL  1541 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 355 FNL  1541 FEL
Log Types:CBL, Mud Log, MWD/LWD, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1718 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 1718 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13833 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2307, Top: 210 ft., Bottom: 13833 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3536 ft.3707 ft.NN
SUSSEX4974 ft.5241 ft.NN
SHANNON6168 ft.6427 ft.NN
SHARON SPRINGS7780 ft.NN
NIOBRARA7976 ft.NN
FORT HAYS8553 ft.NN
CODELL8650 ft.NN
CARLILE8828 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 8828 ft.    Interval Bottom: 13752 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/11/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 8828' - 8993', 12904' - 13269, 13580' - 13752'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8828 ft.# Of Holes:750
Interval Bottom:13752 ft.Hole Size:0.38 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 12/1/2022                 Interval Top: 8800 ft.    Interval Bottom: 13752 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:4/11/2018Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2018Treatment End Date:3/19/2018
Treatment Summary:271,255 lbs 100 Mesh Sand; 4,679,418 lbs 20/40 Sand; 83,743 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):83743Max pressure during treatment (psi):4097
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):8013
Fresh water used in treatment (bbls):83743Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4950673Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8423 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/13/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 315
BBLS_OIL 391
BTU_GAS 1362
CALC_BBLS_H2O 315
CALC_BBLS_OIL 391
CALC_GOR 2028
CALC_MCF_GAS 793
CASING_PRESS 2300
GRAVITY_OIL 45
MCF_GAS 793
TUBING_PRESS 1750
Perforation Data:
Interval Top:8800 ft.# Of Holes:750
Interval Bottom:13752 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 8800 ft.    Interval Bottom: 13579 ft.

 Completed Information for Formation CODELL
1st Production Date:4/11/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8800' - 8827', 8994' - 12903', 13270 - 13579'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8800 ft.# Of Holes:750
Interval Bottom:13579 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1567
Total Gas Produced (MCF)49442
GOR31552
GOR DeterminationMCFE
Average BOE per Day26.796
Average MCFE per Day155.391

 Federal Financial Assurance  i 

 Tribal Well  i No