Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10042
Well Classification: OW Status: PR - 4/1/2023
Well Name/No:PC 1S-66-2928 #14CDH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2023
FacilityID:450055LocationID:450043
County:ADAMS #001Location:NWSW 29 1S66W 6
Field:WATTENBERG - #90750Elevation:5066 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1719FSL  1325 FWLLat/Long: 39.933590 / -104.804200Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.933657 / -104.804196Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/15/2019
End Date: 1/22/2019
Reported: 2/12/2019
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2023             Measured TD: 17747 ft.    Vertical TD: 7735 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/21/2019
Proposed Top PZ Location:Sec:29 Twp: 1S 66W Footage: 1591 FSL  522 FWL
Bottom Hole Location:Sec:28 Twp: 1S 66W Footage: 1579 FSL  532 FEL
Proposed Depth/Form:17504 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17764 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2370, Top: 1500 ft., Bottom: 17764 ft.

Wellbore Completed
Completion Date:8/26/2018
Spud Date:8/10/2018Spud Date Is:ACTUAL
Measured TD:17747 ft.Measured PB depth:17735 ft.
True Vertical TD:7735 ft.True Vertical PB depth:7736 ft.
Top PZ Location:Sec:29 Twp: 1S 66WFootage: 1591 FSL  522 FWL
Bottom Hole Location:Sec:28 Twp: 1S 66WFootage: 1579 FSL  532 FEL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 001-10041).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1601 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1601 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17739 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2816, Top: 135 ft., Bottom: 17747 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4642 ft.NN
SUSSEX5030 ft.NN
SHANNON5709 ft.NN
SHARON SPRINGS7597 ft.NN
NIOBRARA7638 ft.NN
FORT HAYS8144 ft.NN
CODELL8228 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/19/2019                 Interval Top: 8252 ft.    Interval Bottom: 17689 ft.

 Completed Information for Formation CODELL
1st Production Date:3/9/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/15/2019Treatment End Date:1/22/2019
Treatment Summary:Perforated Intervals: 8252'-9123'; 9370'-11796'; 12079'-17689'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8252 ft.# Of Holes:1066
Interval Bottom:17689 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 4/1/2023                  Interval Top: 8202 ft.    Interval Bottom: 17689 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:3/9/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/15/2019Treatment End Date:1/22/2019
Treatment Summary:Frac'd Codell-Fort Hays with a 48 stage plug and perf; 139450 total bbls fluid pumped: 124867 bbls gelled fluid, 14580 bbls fresh water, and 3 bbls 28% HCl acid; 9520450 total lbs proppant pumped: 30/50 sand.
Total fluid used in treatment (bbls):139450Max pressure during treatment (psi):8537
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):3Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13576
Fresh water used in treatment (bbls):14580Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9520450Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8136 ft.
Tubing Packer Depth:8121 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/19/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 242
BBLS_OIL 857
BTU_GAS 1485
CALC_BBLS_H2O 242
CALC_BBLS_OIL 857
CALC_GOR 951
CALC_MCF_GAS 815
CASING_PRESS 915
GRAVITY_OIL 40
MCF_GAS 815
TUBING_PRESS 1607
Perforation Data:
Interval Top:8202 ft.# Of Holes:1129
Interval Bottom:17689 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/19/2019                 Interval Top: 8202 ft.    Interval Bottom: 12056 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/9/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/15/2019Treatment End Date:1/22/2019
Treatment Summary:Perforated Intervals: 8202'-8226'; 9150'-9354'; 11828'-12056'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8202 ft.# Of Holes:63
Interval Bottom:12056 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)8130
Total Gas Produced (MCF)47585
GOR5853
GOR DeterminationBOE
Average BOE per Day44.625
Average MCFE per Day258.832

 Federal Financial Assurance  i 

 Tribal Well  i No