|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2025 Measured TD: 16202 ft. Vertical TD: 7738 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/5/2019 | | Proposed Top PZ Location: | Sec:25 Twp: 1S 66W | Footage: 103 FSL 7 FWL | | Bottom Hole Location: | Sec:24 Twp: 1S 66W | Footage: 2109 FSL 1 FWL | | Proposed Depth/Form: | 16350 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16250 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2149, Top: 1500 ft., Bottom: 16250 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/23/2017 | | Spud Date: | 11/12/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 16202 ft. | Measured PB depth: | 16170 ft. | | True Vertical TD: | 7738 ft. | True Vertical PB depth: | 7738 ft. | | Top PZ Location: | Sec:25 Twp: 1S 66W | Footage: 103 FSL 7 FWL | | Bottom Hole Location: | Sec:24 Twp: 1S 66W | Footage: 2109 FSL 1 FWL | | Log Types: | Mud, Triple Combination, MWD/LWD, CBL. | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1675 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 575, Top: 0 ft., Bottom: 1675 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16175 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2600, Top: 786 ft., Bottom: 16175 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3840 ft. | | N | N | | SUSSEX | 4605 ft. | | N | N | | SHANNON | 5740 ft. | | N | N | | SHARON SPRINGS | 8237 ft. | | N | N | | NIOBRARA | 8281 ft. | | N | N | | FORT HAYS | 8764 ft. | | N | N | | CODELL | 8853 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: CM - 12/21/2018 Interval Top: 10385 ft. Interval Bottom: 15944 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 3/30/2018 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/27/2018 | Treatment End Date: | 3/4/2018 | | Treatment Summary: | Producing Intervals: 10385'-10454'; 13986'-14331'; 15122'-15190'; 15597'-15944'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 10385 ft. | # Of Holes: | 168 | | Interval Bottom: | 15944 ft. | Hole Size: | 0.42 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 6/1/2025 Interval Top: 8917 ft. Interval Bottom: 16074 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 3/30/2018 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/27/2018 | Treatment End Date: | 3/4/2018 | | Treatment Summary: | Frac'd Codell-Fort Hays with 36-stage plug-and-perf;
10800640 total lbs proppant pumped: 30/50 mesh sand;
11519 total bbls fluid pumped: 11457 bbls fresh water and 62 bbls 15% HCL acid. | | Total fluid used in treatment (bbls): | 11519 | Max pressure during treatment (psi): | 8531 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 36 | | Total acid used in treatment (bbls): | 62 | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 8925 | | Fresh water used in treatment (bbls): | 11457 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 10800640 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8779 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/15/2018 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 483 | | BBLS_OIL | 401 | | BTU_GAS | 1340 | | CALC_BBLS_H2O | 483 | | CALC_BBLS_OIL | 401 | | CALC_GOR | 711 | | CALC_MCF_GAS | 285 | | CASING_PRESS | 229 | | GRAVITY_OIL | 41 | | MCF_GAS | 285 | | TUBING_PRESS | 503 |
| | Perforation Data: | | Interval Top: | 8917 ft. | # Of Holes: | 1261 | | Interval Bottom: | 16074 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/21/2018 Interval Top: 8917 ft. Interval Bottom: 16074 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/30/2018 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/27/2018 | Treatment End Date: | 3/4/2018 | | Treatment Summary: | Producing Intervals: 8917'-10357'; 10485'-13952'; 14362'-15089'; 15219'-15566'; 15976-16074'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8917 ft. | # Of Holes: | 1093 | | Interval Bottom: | 16074 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2825 |
| Total Gas Produced (MCF) | 2784 |
| GOR | 985 |
| GOR Determination | BOE |
| Average BOE per Day | 9.001 |
| Average MCFE per Day | 52.211 |
| Federal Financial Assurance | i | |
|
|