Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10022
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:ALMA WEST #26W-20-03
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:449938LocationID:449925
County:ADAMS #001Location:SWSE 25 1S66W 6
Field:WATTENBERG - #90750Elevation:5175 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:387FSL  2038 FELLat/Long: 39.929909 / -104.721850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.929909 / -104.721850Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/20/2023
End Date: 5/1/2023
Reported: 5/23/2023
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 18785 ft.    Vertical TD: 7810 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/5/2025
Proposed Top PZ Location:Sec:26 Twp: 1S 66W Footage: 919 FSL  310 FEL
Bottom Hole Location:Sec:27 Twp: 1S 66W Footage: 924 FSL  302 FWL
Proposed Depth/Form:18761 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: 407-3459 , Unit Acreage: 2560, Drill Unit: T1S R66W: Sec 26, 27
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1622 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 570, Top: 0 ft., Bottom: 1622 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18761 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2515, Top: , Bottom: 18761 ft.

Wellbore Completed
Completion Date:12/9/2022
Spud Date:7/15/2018Spud Date Is:ACTUAL
Measured TD:18785 ft.Measured PB depth:18782 ft.
True Vertical TD:7810 ft.True Vertical PB depth:7810 ft.
Top PZ Location:Sec:26 Twp: 1S 66WFootage: 919 FSL  310 FEL
Bottom Hole Location:Sec:27 Twp: 1S 66WFootage: 924 FSL  302 FWL
Log Types:NO LOGS RAN
Log Types:CBL, MWD/LWD, (Resistivity on 001-10027).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 53 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1622 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 1622 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18782 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2925, Top: 989 ft., Bottom: 18782 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4976 ft.NN
SUSSEX5464 ft.NN
SHANNON6173 ft.NN
SHARON SPRINGS7990 ft.NN
NIOBRARA8013 ft.NN
FORT HAYS8528 ft.
CODELL8604 ft.
CARLILE10516 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/14/2024                 Interval Top: 10516 ft.    Interval Bottom: 16162 ft.

 Completed Information for Formation CARLILE
1st Production Date:7/8/2023Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/20/2023Treatment End Date:5/1/2023
Treatment Summary:Carlile Perforated Intervals: 10516'-11040'; 15226'-16162'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10516 ft.# Of Holes:472
Interval Bottom:16162 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/14/2024                 Interval Top: 10075 ft.    Interval Bottom: 18689 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:7/8/2023Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/20/2023Treatment End Date:5/1/2023
Treatment Summary:Fort Hays Perforated Intervals: 10075'-10090'; 11642'-11797'; 12131'-12498'; 14769'-15046'; 18344'-18689'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10075 ft.# Of Holes:475
Interval Bottom:18689 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 5/1/2025                  Interval Top: 8824 ft.    Interval Bottom: 18720 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:7/8/2023Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/20/2023Treatment End Date:5/1/2023
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with 52 stage plug and perf: 9636344 total lbs proppant pumped: 4679230 lbs 40/70 mesh and 4957114 pounds 100 mesh; 269084 total bbls fluid pumped: 244625 bbls gelled fluid, 23972 bbls fresh water, and 487 bbls 15% HCl acid.
Total fluid used in treatment (bbls):269084Max pressure during treatment (psi):8626
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:52
Total acid used in treatment (bbls):487Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):23972Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9636344Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8381 ft.
Tubing Packer Depth:8379 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/17/2023Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 397
BBLS_OIL 510
BTU_GAS 1300
CALC_BBLS_H2O 397
CALC_BBLS_OIL 510
CALC_GOR 622
CALC_MCF_GAS 317
CASING_PRESS 534
GRAVITY_OIL 40
MCF_GAS 317
TUBING_PRESS 1520
Perforation Data:
Interval Top:8824 ft.# Of Holes:3232
Interval Bottom:18720 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/14/2024                 Interval Top: 8824 ft.    Interval Bottom: 18720 ft.

 Completed Information for Formation CODELL
1st Production Date:7/8/2023Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/20/2023Treatment End Date:5/1/2023
Treatment Summary:Codell Perforated Intervals: 8824'-10062'; 10104'-10515'; 11054'-11641'; 11816'-12117'; 12517'-14749'; 15065'-15212'; 16181'-18330'; 18690'-18720'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8824 ft.# Of Holes:2285
Interval Bottom:18720 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)26038
Total Gas Produced (MCF)43669
GOR1677
GOR DeterminationBOE
Average BOE per Day92.749
Average MCFE per Day537.961

 Federal Financial Assurance  i 

 Tribal Well  i No